Laserfiche WebLink
• Laboratory. Production Office. Personnel Offices and Chance Room Facility <br />Colowyo maintains a multi-purpose facility covering approximately 2 acres <br />in Section 34, Township 4 North, Range 93 West. This facility contains <br />two structures as shown on the Existing Structures - South Map (Map 22). <br />Coal analysis is performed in the laboratory portion of the larger <br />structure. Production crews have locker, shower, and toilet facilities <br />provided in part of the larger structure. The remainder of the larger <br />structure is used for training, safety, crew assembly, and production <br />management offices. The smaller structure contains offices for the Human <br />Resources Department. Included in this area is a paved parking lot used <br />for all production and maintenance personnel based in the area and some <br />company owned small vehicles. <br />Drainage from this area is collected as shown on Map 12 - Hydrology'- <br />South Map and Map 12A Gossard and Mine Maintenance Areas. <br />Crushing and Loadout Facilities <br />• <br />The coal crushing and Loadout facilities include four separate <br />facilities: (1) primary crusher; (2) secondary crusher and train <br />Loadout; (3) stoker coal crusher; and (4) stoker Loadout siding. <br />The primary crusher facility is located in Section 3, Township 3 North, <br />Range 93 west, as shown on the Existing Structures - South Map (Map 22). <br />Included in the primary crusher facility are a raw coal stockpile area, <br />a truck dump, a primary crusher, a covered conveyor, a storage bin, and <br />a truck load-out. This facility was constructed in 1979. <br />~ Coal is typically hauled from the pit in 170-ton rear dump haulage trucks <br />to the primary crusher site. The coal is then dumped directly into the <br />truck dump hopper, or stockpiled. The truck dump is equipped with dust <br />control spray bars. The coal from the stockpile is fed into the hopper <br />by front-end loaders. Feeders at the bottom of the truck dump hopper <br />discharge the coal into the primary crusher. The primary crusher reduces <br />the raw coal to an <br />2.05-17 <br />Ravisi;,n,-,fir ev~7-- V z 2 ~'- <br />Re'~~ isio:', :.~. <br />`12 <br />