Laserfiche WebLink
Main Office <br />The main office for the Colowyo operation is located in Section 23, <br />Township 4 North, Range 93 West. The office building was <br />constructed in 1977 and contains approximately 9,000 square feet. <br />The office houses Colowyo's administration, engineering, environ- <br />mental, accounting, and payroll departments. <br />Shog and Warehouse Facility <br />Colowyo maintains a shop and warehouse facility at the operation <br />covering approximately 30 acres in Section 34, Township 4 North, <br />Range 93 West. This facility consists of several structures as <br />shown on the Existing Structures - South Map (Map 22). <br />Major mechanical repair work on the mobile mining equipment fleet <br />is performed at the shop facility. A welding facility is also a <br />part of the shop. The warehouse contains an inventory of equipment <br />parts for use in the comprehensive maintenance program. Outside <br />storage of the larger parts is used because of the limited covered <br />building space. Adjacent to the shop is a maintenance office and <br />• an employee-change facility. The maintenance office is utilized by <br />foremen, clerks and other individuals employed at the mine. <br />Employees use the change facility in this location before and after <br />their shift to change either into their work clothes or back into <br />their street clothing. Shower facilities are provided in the <br />change complex. Additional structures in the complex include a <br />diesel fueling and gasoline fueling station for both the large <br />mobile mine equipment and the mine pickup truck fleet, and a <br />650,000 gallon diesel fuel storage system. Mobile equipment and <br />employee parking areas are also provided at the complex. Several <br />coal stockpile areas as shown on the Existing Structures - Map, <br />(Map 22) are found near the shop facility to provide for temporary <br />storage of the coal. A reclamation storage building, storage yard, <br />and a records storage building are also located in this area. <br />Drainage from the shop and warehouse complex is collected as shown <br />on the Map 12 - Hydrology - South and Map 12A Gossard and <br />Maintenance Areas. This structure has been designed as shown under <br />the Ponds, Impoundments and Diversions Section of 2.05.3. <br /> <br />2.05-16 <br /> <br /> <br />