• by at least 0.96 feet in order to meet the 4 foot requirement. The <br />spillway currently extends 20 feet below the toe of the dam but <br />this extension will require erosion control material. The east and <br />west side slopes need to be repaired since both currently exceed <br />the 3:1 requirement. Cracks in the top of the dam were also <br />observed during the inspection but the depth of the cracks could <br />not be determined. <br />9/l0-F -- The elevation of the spillway crest needs to be reduced <br />by at least 1.35 feet in order to meet the 4 foot requirement. The <br />spillway also needs to be extended 20 feet below the toe of the dam <br />and erosion control material should be placed in this extension. <br />All side slopes of this pond appear to meet the 3:1 requirement. <br />9/10-G -- The elevation of the spillway crest needs to be reduced <br />by at least 0.52 feet in order to meet the 4 feet requirement. The <br />spillway also needs to be extended 20 feet below the toe of the dam <br />and erosion control material should be placed in this extension. <br />The side slopes on the east and southwest side of the pond need to <br />be reduced to meet the 3:1 requirement. Currently the east side <br />slopes are as steep as 2.64:1. <br />9/10-I -- The elevation of the spillway crest needs to be reduced <br />by at least 1.96 feet in order to meet the 4 foot requirement. This <br />modification will also correct the inadequate residual freeboard at <br />peak flow that currently exists. The spillway needs to be extended <br />• 20 feet below the toe of the dam but erosion control material is <br />not required in this extension. The side slopes of the pond meet <br />the 3:1 requirement but the embankment upstream slope is steeper <br />than the 2.5:1 requirement and will require modifications. A crack <br />in the top of the embankment was observed during the inspection but <br />the depth of the crack could not be determined. <br />9/10-K -- The elevation of the spillway crest needs to be reduced <br />by at least 1.71 feet to meet the 4 foot requirement. This <br />modification will also correct the inadequate residual freeboard at <br />peak flow that currently exists. The spillway needs to be extended <br />20 feet below the toe of the dam and this extension requires <br />erosion control material. While the majority of the side slopes <br />meet the 3:1 requirement, there is an area on the west side of the <br />pond that has a slope of 1.6:1 that needs repaired. <br />9/10-L -- The elevation of the spillway crest needs to be reduced <br />by at least 2.04 feet. This modification will also correct the <br />inadequate residual freeboard at peak flow that currently exists. <br />The spillway needs to be extended 20 below the toe of the dam and <br />this extension will require erosion control material. The <br />embankment upstream slope needs to be reduced near the spillway as <br />it is currently 2.25:1. Also, the south side slope of the pond <br />needs to be reduced as it is currently 2.4:1. During the inspection <br />a crack was observed in the top of the embankment but the depth <br />could not be determined. <br />• 9/10-M -- The upstream and downstream embankment slopes need <br />