7-E -- The major problem with this pond is that it does not meet <br />the minimum 10 acre requirement for the tributary area. However, <br />you had mentioned that CDMG may allow this pond to be retained <br />through the submittal of a minor revision. It is assumed that if <br />the minor revision is approved, the pond will still have to meet <br />all other requirements of the two agencies listed above. Therefore, <br />the side slopes on the south and west sides of the pond will have <br />to be reduced since there are areas where the slopes are steeper <br />than 3:1. One area on the south side slope measures at a 1.91:1 <br />slope. Also, the elevation of the spillway crest will need to be <br />reduced by at least 1.33 feet to meet the 4 foot requirement. Also, <br />the spillway will have to be extended 20 below the toe of the dam <br />and will require erosion control material. Please note that the <br />spillway calculations performed for this pond were for a l0 foot <br />wide spillway. If the spillway is widened to a width less than l0 <br />feet, additional calculations will have to be performed. <br />7-F -- The elevation of the spillway crest needs to be reduced by <br />1.36 feet. This modification will also correct the inadequate <br />residual freeboard at peak flow that currently exists. The spillway <br />also needs to be extended 20 feet below the toe of the dam and this <br />extension will require erosion control material. The side slopes on <br />the south side of the pond need to be reduced as there is an area <br />that is currently 2.14:1. The upstream embankment slope also needs <br />reduced as it is currently 2.1:1 which exceeds the 2.5:1 <br />requirement. A crack in the top of the dam was also observed during <br />• the inspection but the depth of the crack could not be determined. <br />7-G -- The elevation of the spillway crest needs to be reduced by <br />at least 1.5 feet. Also, the spillway needs to be extended 20 feet <br />beyond the toe of the dam and this extension will require erosion <br />control material. All side slopes of this pond appear to meet the <br />requirements of the permit and the two agencies. A crack in the top <br />of the embankment was observed during the inspection but the depth <br />of the crack could not be determined. <br />9/10-A, 9/10-D, 9/10-H, & 9/10-J -- All four of these ponds do not <br />meet the minimum 10 acre tributary area. You have informed me that <br />CYCC will not try to maintain these ponds through the minor <br />revision process. Therefore, these ponds will be removed. <br />9/10-B -- The spillway of this pond needs to be extended 20 feet <br />below the toe of the dam and erosion control material will be <br />required in this extension. The grade of the upstream embankment <br />slope needs to be reduced from 2.29:1 to at least 2.5:1. The side <br />slopes of the pond on the east and south sides of the pond need to <br />be reduced to 3:1 as the slopes currently are as steep as 1.55:1. <br />The spillway width is currently about 3 feet wide, but after <br />modifications it should be at least 8 feet wide. This width will <br />match the width used in performing the spillway calculations. A <br />crack in the top of the dam was also observed during the <br />inspection. The depth of the crack could not be determined. <br />9/10-C -- The elevation of the spillway crest needs to be reduced <br />