My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70416
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:34 PM
Creation date
11/20/2007 11:21:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
Permit File
Doc Date
3/3/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />D02ER COST 8 PERFORMANCE DATA UORKSHEET <br />Machine Make 8 Model: Cat D7H SERIES II (1996) <br />Dozer Blade: SEMI-UNIVERSAL <br />Attachment #1: RWS Cab <br />Attachment #2: <br />Last Cost Revision: April, 1997 <br />BASE EQU[PMENT COSTS (CRG) <br />n <br />u <br />sheet 1 of 2 sheets <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equipment Cos[ Guide (CECG) <br />3) Colorado Contractors Association <br />Nage Rate Schedule <br />4) Caterpillar Performance Handbook <br /> ----------- Base ONnersh ip & Overhaul Costs ------------~ --------------- Base Operating Casts ------- -------- <br /> Ownership ~ Overhaul ~ Field Repair <br /> <br />_________________________ Depreciation <br />________________ CFC <br />______________ Overhead ~ <br />____________ labor <br />________ Paris <br />_______ Labor <br />________ Parts <br />_______ ~ Fuel <br />_______________ Lube <br />_______ Tires <br />_______ G.E.C. <br />________ <br />_________________________ <br />Machine ________________ <br />E13. 71 ______________ <br />E5.87 ________ ___ <br />E5.52 _____ _ <br />E2.76 _ __ __ <br />E9.10 __ __ _ <br />E3.41 _ __ __ <br />E7.35 __ __ <br />E8 __ __ __ <br />.97 _______ <br />E2.74 _______ <br />E0.00 _______ <br />E1.19 <br />Attachment #1 E0.00 E0.00 E0.00 E0.00 E0.00 E0.00 E0.00 E0 .00 E0.00 E0.00 E0.00 <br />Attachment #2 E0.00 50.00 E0.00 E0.00 E0.00 E0.00 E0.00 E0 .00 E0.00 E0.00 E0.00 <br />COST ADJUSTMENT FACTORS (CECG) <br /> ACOUI SITION COST BREAKDONN <br />Factor Description <br />_________________________ Base Value <br />__________ <br />__ <br />__ Adj. Value <br />__ <br />__ <br />__ <br />_ Multiplier <br />_ <br />_ <br />_ <br />_ ~ Cost Elements (CECG) Factor Adj. Cost <br /> <br />Acquisition cost: _ <br />_ <br />E292, 705.00 _ <br />_ <br />_ <br />_ <br />__ <br />8208,717.40 __ <br />__ <br />__ <br />__ <br />0.713 I <br />~ -__-__-__-__-__-__. __-__ <br />Base purchase price -__-__-_ _-_--_--_-._ <br />E292, 705.00 <br />Econ. life hrs.-mach ine: 12,120 9,545 1.270 ~ Less dealer discount 0.142 E41, 564.11 <br />-attach. #1: 11,000 11,000 1.000 ~ Plus freight 0.013 E3,SD5. 17 <br />-attach. #2: N/A N/A 1.000 ~ Plus dealer charges* 0.005 51,463.53 <br />Annual use hours: 2,112 1,395 1.514 ~ *CDMG estimate ------------ <br />Mechanic~s labor cast: E27.15 523.49 0.865 ~ Adjusted purchase price E256,409.58 <br />Fuel cos C/gal.-gasoline: E1.20 51.20 1.000 ~ PLus taxes: Sales a 3% E7,692.29 <br />-diesel: E1.07 E1.07 1.000 ~ SMM a2% E5,128.19 <br />Lube cos[: E2.74 E2.74 1.000 ~ less tire cost E0.00 <br />Tire life hours: 0 0 1.000 ~ Less salvage value 0.236 E60,512.66 <br />Tire factor: 0 0 1.000 ~ ------------ <br />Tire cost: <br />_________________________ E0.00 <br />________________ E0.00 <br />_____________ 1.000 <br />____________ ~ <br />I Net acquisition cost <br />-__-__-__-_--_--_--_--_. <br />-_. __-__ E208,717.40 <br />-__-__-__-_- <br />ADJUSTED EQUIPMENT COSTS <br /> ---------- Adjusted ONnership 8 Overhaul Costs ---------~------------- Ad justed Oparating Costs ------ ------- <br />Acquisition cost E9.78 N/A N/A N/A N/A N/A N/A N/A N(A N(A N/A <br />Econ.life -Dozer 8 ROPS E12.41 N!A NIA E3.50 E11.55 E4.33 E9.33 N/A N/A N/A N/A <br />-Attach. #2 N/A NIA N!A 50.00 E0.00 E0.00 E0.00 N/A N/A N/A N/A <br />Annual usage E14.80 E8.89 E8.36 N/A NIA NIA N/A N/A N/A N/A N/A <br />Double shifts E11.10 E4.44 E4. 18 N(A N(A NIA NiA N/A N/A N/A N/A <br />Triple shifts E9.87 E2.96 E2.78 N/A N/A N/A N/A NIA NIA N/A N/A <br />Mech.labor-Dozer 8 ROPS N/A N/A N/A E3.03 N/A E3.75 N/A N/A N/A NIA NiA <br />-Attach. #2 NJA NIA N/A E0.00 N/A E0.00 N/A N/A N/A N/A NIA <br />Fuel/lube -Dozer 8 ROPS N/A NIA N/A NIA N/A N/A N/A E8.97 E2.74 E0.00 E1.19 <br />-Attach. #2 N/A N/A NIA NIA NIA N/A N/A E0.00 E0.00 E0.00 E0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.