My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70416
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:34 PM
Creation date
11/20/2007 11:21:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977546
IBM Index Class Name
Permit File
Doc Date
3/3/1999
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DOZER COST 8 PERFORMANCE DATA NORKSNEET cont'd <br />Model: Lat D7H SERIES II (1996) <br />ADJUSTED COST SUBTOTALS <br />i <br />----------------------•-- --- Ownership Costs <br />Dozer, ROPS 8 Attachment #2: <br />Single shifts E14. 80 E8.89 <br />Deuble shifts E11. 10 E4.44 <br />Triple shifts 89. 87 82.96 <br /> <br />sheet 2 of 2 sheets <br />---- ~------------------ Overhaul & Operating Casts --•------------------ <br />Dozer 8 BOPS: <br />E8.36 E3.03 E11.85 E3.75 59.33 E8.97 E2.74 50.00 E1.19 <br />E4.18 Attachment #2: <br />E2.78 50.00 E0.00 E0.00 E0.00 E0.00 50.00 E0.00 E0.00 <br />HOURLY OPERATOR NAGES <br /> Base Fringe F.I,C.A Unempl. Nk.Oomp. Total I Shift <br />Labor Classification Ra[e Benefits 7.70% 6.20Y. 12.50% (Eihr)~ Differential <br />_______ <br />Dozer ________ <br />operator ______________ <br />(< 70hp) _____________ <br />E14.32 ______________ <br />E4.13 ___________ <br />E1.10 ________ <br />80.89 ________ <br />E1.79 _______I <br />E22.23 ~ -_-_-----_--__-I <br />Day E0.00 ~ 2 shift/day avg.: E0.15 <br />Dozer operator (>=70hp) E15.02 E4.13 E1.16 E0.93 81.88 E23.12 ~ Swing: E0.30 ~ 3 shift/day avg.: E0.25 <br />Mechanic 815.32 84.13 51.18 E0.95 E1.92 E23.49 ~ Night: E0.45 <br />HWRLY EQUIPMENT COST SUMMARY <br /> Ownership ~ Operating 8 Overhaul Costs ~ Operator ~ Total <br /> <br />_ Costs ~ <br />______________ Dozer <br />_____________ Ripper I <br />__________________ Costs ~ <br />_________________ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ Cost/NR (S) <br />_______________ <br />_ <br />__ <br />____ <br />__ <br />__ <br /> <br />Single _ <br />shifts ______________ <br />E32.05 _____________ <br />E40.57 ___________________ <br />50,00 __ <br />__ <br />__ <br />__ <br />_ <br />823.12 _ <br />_ <br />_ <br />_ <br />_ <br />E95.73 <br />Double shifts E19. 72 E40.57 E0,00 823.27 883.56 <br />Triple shifts E15.61 840.57 E0, 00 523.37 E79.55 <br />EW IPMENT PERFORMANCE DATA <br /> - - - EOUI PMENT SPECIFICATIONS - - - <br /> Horsepower Trans. Nei ghC Len9 [h Nid[h Height Fuel Ripper <br /> Description (FHP) Type (tons) (ft.) (ft.) (f t,) Type Type <br />MACHINE MAKE 8 MODEL: Lat D7H SERIES 215 Powershift 22.4 19.8 9.4 10.9 diesel N/A <br />D02ER BLADE: SEMI-UNIVERSAL N/A N(A 4.0 N/A 12.1 5.0 NIA N/A <br />ATTACHMENT #1: ROPS Cab N/A N/A N(A N!A N/0. N/A NIA N/A <br />ATTACHMENT #2: N/A N/A N/A N/A N/A NfA N/A N/A <br /> Total Nt.: 26.8 tons <br />
The URL can be used to link to this page
Your browser does not support the video tag.