Laserfiche WebLink
14. Other Environmental Permits: Does this facility currently have any other environmental permits, or is it subject to regulation, under any <br />of the following programs? <br />Permit Name Yes No Date Applied For Permit No. <br />a) CO-Div. of Minerals Ec Geology (formerly MLRD)• :i .lul.y JU, 199 C-92-U8U <br />b) Dredge or fd1 permit under Section 404 of the Clean <br />Water Act (CWA) (Army Corps of Engineers) <br />X <br />c) CDPS Stormwater•• \ COR- <br />d)Other-(list) Lanu Use Permit COUIPI~V to ~ <br />• If Yes to item 14.a), please include Mined land Reclamation Board permit anniversary date: .Ju 1 v . 1998 <br />•• If Yes OR No to item 14.f), please read and comply with items 37 and 3g, u eppGcable. <br />13. Site-specific Conditions: <br />a) Ls this operation located within one mile of a landfill, or any mine or mill tailings from a historic site? No ^ Yes <br />b) is there actual or suspected groundwater contamination such as plumes from leaking underground storage tanks, etc.? No X^ Yes ^ <br />If Vrs for any of these, please show location of the landfdl, lailiags or groundwater contamination on the location map in item 11 or N <br />the site akelch in item 12. Please explain the location, extent of contamination and possible eRect on the discharges from this facility. <br />See Exhibit A. <br />16. Chemical Treatment: Will army Oocculants/settling agents or other chemical additives be used to treat water or otherwise be N the <br />discharge? No ~ Yes LJ If Yes, list here and include the Material Safety Data Sheet (MSDS) with the application it not <br />previously submitted. MSDS should include aquatic toxicity data. Uu additional sheets if necessary. <br />17. Used or Manufactured Toxics: The applicant must provide a list of any toxic products which ells applicant cuaentlx.ases or manufactures <br />as an intermediate or final product or byproduct. <br />N.A, <br />18. flow Measurement: Whaf method of flow measurement will be used for each discharge point (e.g., v notch weir, pump capacity, parshall <br />Rome, etc.)? Designate whether currently installed or proposed. Identity the minimum and maximum flow measurement capabiltry. List the <br />last date calibrated. <br />Flume installed below sediment pond No. 2 No calibration reouired, <br />19. Improvements: Please provide a description of any abatement requirement, abatement project and projected final compliance dates i( subject <br />to any present requirements or compliance schedules for construction, upgrading or operation of waste Ireaunent equipment. List any <br />changes from previous permit. <br />llni er rte 11Mr' parmi,Jy~py ?~i al ,li.,nrci nn ~rrr,n rr,ro rn rnura trnrm water around rhe_ <br />fill pile is planned for construction in summer of 1997. <br />20. Iand Application: Is or will land arplication of any wastewater be practiced? No ~ Yes ^ If Yes, please provide a copy of <br />the materiel submitted to the Division of Minerals and Geology on the discharge and include a copy of the DMG approval where <br />applicable. Briefly describe the process: <br />Coal Mining App. I/96 <br />• 11 the Nemtol formula u unkrown or anhduuiil, provide dlc rrunufrcasru'r wrc, moon pmoo, addrns ud pMrc number or a copy of the muwfauuru'a brochure, <br />pradutl label infornution w nuterials lurdling dau rim rot och product uad. Fluse list We mryor mraotucm or rpive ingredirm(s), it krown. <br />