<br />6. Industrial'Aelivity: Describe the primary industrial activities which take place on site. Include dte type of facility (underground mine,
<br />surface mine, err.) plus a brief description of the nature of the business and the industrial processes used. Include a description of the mining
<br />and coal preparation processes where applicable. (The applicant may want to submit a process flow sheet.)
<br />Carbon .Junction ?tine is a surface nine wlriclt, when active, n_ roduces coal for sale and
<br />[ransnor[, At this time the mine is in temnorarv cessation, with the only activities
<br />beinC placement of waste material from a nearby gravel operation (nermittecl) on a mine
<br />area fill pile and the early stages of golf course uevelopment nearby,
<br />7. Indicate whether an exploratory, active mining, inactive mining, or post mining operation or is the site in temporary cessation.
<br />The site is in temporary cessation.
<br />1t exploratory, plnx submit any known water qualirylquantiry dau relative to the discharge(s) and the receiving stream(s) that reflect the
<br />conditions prior to the present activity, the length of tune the activity is expected to be under exploration and describe what activities will
<br />lake place during exploration that could have an impact on the quantity or the quality of the discharge. if post mining, describe arcas
<br />affected and extent of «clamation completed and length of time elapsed since revegeution occurred. Also, specify whether any outfalls
<br />previously described serve, partially or totally, a reclaimed area. Include expected bond release date.
<br />V.A.
<br />8. Production: List the principal product(s) produced and tumor and maximum production rates.
<br />The yrincipal product is coal, The currenC production rate is zero tons per day.
<br />9. $ this a seasonal operation? No ~ Yes ^ If Yes, please list the months of operation.
<br />If coal were beine produced it would not be on a seasonal basis.
<br />10. Intermittent Discharges: Except for storm runoff, are any of the discharges described in item 21 intermittent or seasonal?
<br />No ^ Yes ^ If Yes, describe the frequency, duration and Bow rate of each discharge occurrence.
<br />*I.A. Storm runoff only,
<br />11. l.otalion Map: A g'h : 11 Inch location map designating the facility property, intake points, discharge points, each of its hazardous waste
<br />treaunent storage or disposal facilities, areas in post mining, each well where fluids from the facility are injected underground, those wells,
<br />springs, odter surface water bodies and drinking water wells listed N public «cords or otherwise known to the applicant and the receiving
<br />waters shall be submined. The map shall extend one mile beyond the property boundaries. The map shall be from a 7'h or IS minute USGS
<br />quad sheet, or a map of comparable scale. A north arrow shall be shown. A larger map may be included for reference if the permittee
<br />wishes. See Exhibit A.
<br />12. Site Map: A 8'fi x 11 inch map of the site shall be submitted showing facility features (whenever possible) such as buildings, ponds,
<br />diversion ditches, stream locations, numbered discharge points, sampling and flow monitoring points, land application areas, stockpiles, waste
<br />rock piles, topsoil piles, location of french drains andlor spoils springs, trosher areas, mine drainage Bow paths, domestic wastewater
<br />treatment plants, power plants, wck washing areas, explosive storage areas, parking lots, vehicle maintenance areas, chemical storage areas,
<br />etc. Thr: outfalls shall be labeled to correspond with the numbers listed in item 21. A larger map may be included for reference if the
<br />permiltee wishes.
<br />See E:chibit 3.
<br />13. Water Balance: Attach a line drawing showing all water Bow through and from the mine/preparation plant sites. Indicate sources of intake
<br />water, operations convibuting wastewater to the effluent, and treatment units labeled to correspond to the more detailed descriptions in item
<br />21. Construct a water balance on the line drawing by showing average Bows between inukes, operations, treatment units and outfalls. If a '
<br />water balance cannot be determined, provide a pictorial description of the nature and amount of any sources of water and any collection or
<br />veaunent measures. 1f not applicable, please indicate. N. A. No process water used.