Laserfiche WebLink
CIRCES Cost Estimating Software <br />WHEEL LOADER -LOAD AND CARRY WORK <br />7ask» : 005 <br />Date: 071282006 <br />User: WHE <br />State :Colorado <br />County:San JUan Abbreviation :none <br />Site :Upper Animas Sand 8 Gravel Filename :M065-005 <br />Permivjob u : M•2005-065 <br />Agency or organization name : DMG <br />Permit or other job action : f 10c application review <br /> Task description :Carry 101.8 cy riprap to inlet location <br /> <br />HOURLY EQ UIPMENT COST Basic machine: CAT446B (2004) ~ Horsepower 102 <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breaktlown : Ownership wsuhour: $13.47 NA <br /> Operating cosuhour: $18.14 100 <br /> Operator cosVhour: $32.53 NA <br /> Total unit wsVhour: $64.73 Total Fleet cosuhour: $64.13 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume: 102 LCY factor: NA volume: 102 LCY <br />Source of quantity take-off :Exhibit E-3, Floodway Inlets <br />Source o£ estimated swell factor : NA <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cmle T'me Urtadjusfed basic cycle time (load, dump, maneuver) : 0475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Bank or broken material 0.040 (Cat HBl <br />Stockpile: Dumped by truck 0.020 (Cat HB) <br />Truck ownership: NO adjustment-/actor not applicable 0.000 (Cat HB) <br />Operation : No adjustment - /actor no[ applicable 0.000 (Cat HB) <br />Dump target Fragile target 0.050 (Cat HB) <br />Nel cycle time adjustment: 0.770 minutes <br />Adjustetl basic cycle time: 0.585 minutes <br />Rolling Resistance -Road Contlitions <br />Haul :Loose sand or <br />Return : Coose sand orgrave! <br />Haul and Return Time Length <br />(feet) Gratle res. <br />(%) Rolling res <br />(%) , Total res. <br />(%) Travel time <br />(minutes) I Data <br />Soucez <br />Haul route : 200 0.00 10.00 10.00 0.2257 (Cat HB) <br />Return route: 200 0.00 10.00 10.00 0.2257 (Cat HB) <br />Loader Bucket Caoacilv <br />Rated capacity: <br />Bucket fill factor: <br />1.50 LCY (heaped) <br />0675 Blasted rock-poodv blasted <br />Total travel time: 0.4502 minutes <br />Total cycle time : 1.035 minutes <br />Adjusted capacity: 1.01 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor: 0.91 (Ca(HBJ <br />Site altitude: 9,700 feet Job effciency factor: O.B3 (l shilVdayJ <br /> Net correction : 0.76 multiplier <br />Unadjusted hourly unit production : 58.68 LCY/Hr <br />Adjusted hourly unit production : 44.32 LCY/Hr <br />Adjusted hourly fleet production : 44.32 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Totaf job time : 2.30 Hours <br />Unit cost: $7.447 /LCY Total job wst: $147 <br /> <br />