My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70140
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:16 PM
Creation date
11/20/2007 11:13:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005065
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
Approval of 110c Application
From
DMG
To
Charles Ponchak
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 006 <br />Date : 02/28/2006 <br />User : WHE <br />State :Colorado <br />County <br />Site <br />PermiUjob # :M-2005-065 <br />Abbreviation :none <br />Filename : M065-006 <br />Agency or organization name :DMG <br />:San Juan <br />:Upper Animas Sand & Gravel <br />;anon review <br />Ill~et' f0/ r/praD <br />Permit or other job action : 110c <br />Task description :Plej <br />HOURLY EQUIPMENT COST <br />Machine description :Cat 307C <br />Horsepower: 55 <br />Weight (MT) : 6.49 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $13.66 NA Shift basis : 1 per day <br />Operating cosUhour : $14.01 100 Data source : (CRG) <br />OperatorcosUhour : $32.72 NA <br />Total unit cosUhour : $60.39 Total fleet cosUhour : $60.39 <br />MATERIAL QUANTITIES <br />Initial Swelf Loose <br />volume : 102 LCY factor : NA volume : 102 LCY <br /> <br />Source of estimated volume :Exhibit E-3, Floodway Inlets <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swing loaded dump bucket swing emoNl <br /> Basic job condition description : SEVERE <br />Secondary job condition within basic description : SEVERE <br /> Cycle time value : 0.33 minutes <br />Bucket Capacity <br />Rated bucket capacity : 0.20 LCY (heaped) Bucket size class : small <br />Bucket fill factor ; 0.97 Sand and gravel (95% - 100%) <br />Adjusted bucket capacity ; 0.20 LCY <br />Job Condition Correction Factors Source <br />Site altitude : 9,700 feet Altitude adjustment : 0.87 (Cat HB) <br /> Job efficiency adjustment ; 0.83 (1 shiff/day) <br /> Net job correction ; 0.72 multiplier <br /> <br />Unadjusted hourly unit production : 36.00 LCY/hour <br />Adjusted hourly unit production : 26.00 LCY/hour <br />Adjusted hourly fleet production : 26.00 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 3.92 hours <br />Unit cost : $2.323 per LCY Total job cost : $236 <br />
The URL can be used to link to this page
Your browser does not support the video tag.