Laserfiche WebLink
Date : 02/28/2006 <br />User : WHE <br />County :San Juan <br />Site :Upper Animas Sand & Gravel <br />Abbreviation :none <br />Filename : MO65-004 <br />Agency or organization name : DMG <br />Permit or other job action :110c al <br />Task description : P-aCe <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />review <br />Ift Sp11-Wdy CIIt <br />Machine description :Cat 307C <br />Ownership cosUhour <br />Operating cosUhour <br />Operator cosUhour <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 81 LCY <br />Utilization °1° <br />$13.66 NA <br />$14.01 100 <br />$32.72 NA <br />$60.39 <br />Swell Loose <br />factor : NA volume <br /> <br />Source of estimated volume :Exhibit E-2, Outflow Channel <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dump bucket swino empty) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value <br />Bucket Caoacitv <br />Rated bucket capacity : 0.20 LCY (heaped) <br />Bucket fill factor : 0.45 Rock -Poorly <br />Adjusted bucket capacity : 0.09 LCY <br />Job Condition Correction Factors <br />Site altitude : 9,700 feet <br />Horsepower: 55 <br />Weight (MT) : 6.49 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cosUhour : $60.39 <br />84 LCY <br />SEVERE <br />SEVERE <br />0.33 minutes <br />Bucket size class : small <br />blasted (40% - 50%) <br />Source <br />Altitude adjustment : 0.87 I (Cat HB) <br />Job efficiency adjustment : 0.83 ~ (1 shift/day) <br />Net job correction : 0.72 multiplier <br />Unit cost : $5.033 per LCY Total job cost : $408 <br />