My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70140
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:16 PM
Creation date
11/20/2007 11:13:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005065
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
Approval of 110c Application
From
DMG
To
Charles Ponchak
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date : 02/28/2006 <br />User : WHE <br />County :San Juan <br />Site :Upper Animas Sand & Gravel <br />Abbreviation :none <br />Filename : MO65-004 <br />Agency or organization name : DMG <br />Permit or other job action :110c al <br />Task description : P-aCe <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />review <br />Ift Sp11-Wdy CIIt <br />Machine description :Cat 307C <br />Ownership cosUhour <br />Operating cosUhour <br />Operator cosUhour <br />Total unit cost/hour <br />MATERIAL QUANTITIES <br />Initial <br />volume : 81 LCY <br />Utilization °1° <br />$13.66 NA <br />$14.01 100 <br />$32.72 NA <br />$60.39 <br />Swell Loose <br />factor : NA volume <br /> <br />Source of estimated volume :Exhibit E-2, Outflow Channel <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket swing loaded dump bucket swino empty) <br />Basic job condition description <br />Secondary job condition within basic description <br />Cycle time value <br />Bucket Caoacitv <br />Rated bucket capacity : 0.20 LCY (heaped) <br />Bucket fill factor : 0.45 Rock -Poorly <br />Adjusted bucket capacity : 0.09 LCY <br />Job Condition Correction Factors <br />Site altitude : 9,700 feet <br />Horsepower: 55 <br />Weight (MT) : 6.49 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cosUhour : $60.39 <br />84 LCY <br />SEVERE <br />SEVERE <br />0.33 minutes <br />Bucket size class : small <br />blasted (40% - 50%) <br />Source <br />Altitude adjustment : 0.87 I (Cat HB) <br />Job efficiency adjustment : 0.83 ~ (1 shift/day) <br />Net job correction : 0.72 multiplier <br />Unit cost : $5.033 per LCY Total job cost : $408 <br />
The URL can be used to link to this page
Your browser does not support the video tag.