Laserfiche WebLink
CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />-eaz 3 <br />02/28/2006 <br />County :San Juan <br />State :Colorado <br />Permit/job # : M-2005-065 <br />Abbreviation :none <br />WHE Site :Upper Animas Sand & Gravel Filename :M065-002 <br />Agency or organization name :DMG <br />Permit or other job action :110c appli~ <br />Task description :Prepare <br />HOURLY EQUIPMENT COST <br />review <br />wav for <br />Machine description :Cat 307C <br />Horsepower: 55 <br />Weight (MT} : 6.49 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $13.66 NA Shift basis : 1 per day <br />Operating cost/hour : $14.01 100 Data source : (CRG) <br />Operator cosUhour : $32.72 NA <br />Total unit cost/hour : $60.39 Total fleet cosUhour : $60.39 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />Job Condition Correction Factors Source <br />Site altitude : 9,700 feet Altitude adjustment : 0.87 (Cat HB) <br /> Job efficiency adjustment : 0.83 (1 shift/day) <br /> Net job correction : 0.72 multiplier <br />Unadjusted hourly unit production : 36.00 LCY/hour <br />Adjusted hourly unit production : 26.00 LCY/hour <br />Adjusted hourly fleet production : 26.00 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) Total job time : 3.10 hours <br />Unit cost : $2.323 per LCY Total job cost : $187 <br />