Laserfiche WebLink
CIRCES Cost Estimating Software <br /> WHEEL LOADER -LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task#: 002 State :Colorado PermiUjob#:M-2005-065 <br />Date: 02/28/2006 County:San Juan Abbreviation :none <br />User: wHE Sile:Upper Animas SandB Gravel Filename :MO6&002 <br />Agency or organization name <br />Permit or otherjob action <br />review <br />task description :Carry 80.6 ey riprap to spillway location <br />HOURLY EQUIPMENT 0057 Baslc machine CAT446B (2004) Horsepower: 702 <br />Attachment no. 1 ROPS Cab Shift basis : 7 per day <br /> Data source : (GRG) <br /> Utilization <br />Co t B akdown : Ownership oost/houc $73.47 NA <br />Operating cost hour : $78.74 700 <br />Operator cosVhour : $32.53 NA <br />Total unit cosUhour : 364.13 Total Fleet cosVheur. $64.13 <br />MATERIAL QUANTITIES <br />Initial Sweli Final <br />factor: NA volume: 81 LCY <br />volume: 81 LCY <br />Source of quantity takeoff :Exhibit E-2, Outflow Channel <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION ~~ (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br /> I Factor (min J , Source <br />Cycle Time Factors 040 <br />0 (Cat HB) <br />Material : Bank or broken material ~ . <br />_ <br />v".v20 `Car HB} <br />St kp le D rap dbyt k 000 <br />0 (Cat HB) <br />Truck ownership'. No adjustment - /actor not applicable . <br />OperaY On No adjustment factor not appRable 0.000 (Cat HB) <br />- _ ~~~r,,. nr Wool"cahle 0.000 (Cat HB) <br />Nel cydetime adustment: 0.060 minutes <br />Adlusted basic cycle time : 0.535 minutes <br />Roll'no Res sta cP-Road Contlitions <br />Haul :Loose sand or <br />Return :Loose sand or <br />Haul and Return Time Length Grade res. <br />~ Rolling res. I Total res. I Travel time Data <br />` (feet) (!) (%) (%) (minutes) Source <br />Haul route ~ 200 0 00 f0-00 70.00 02251 (Cat HB) <br />amum route ~ 200 ~ 0.00 10.00 70.00 02251 (Car HBJ <br />Total travel time: 0.4502 manures <br />Loader Bucket GaoadN Total cycle time : 0.985 minutes <br />Rated capacity: 1.50 LCY (heapetl) <br />Bucket fill fac[oc 0.675 Blasted rock -poorly blasted (60 - 75%) <br />Adjusted capacity: 1.01 LCV Source <br />Job Co d'f n Correct'on Factors Altitude adjustment factor : 0.97 (Cat HB) <br />Site altitude: 9,700 feet Job efficiency factor: 0.83 (1 shiR/day) <br />Net cortection'. 0.76 multiplier <br />Unadjusted hourly unit production : 61.66 LCYiHr <br />Adjusted hourly unit production : 46.57 LCY/Hr (Cal HB) <br />Adjusted hourly fleet production : 46.57 LCY/Hr <br />JOB TIME AND COST <br />Total job time : 1.73 Hours <br />Fleet size: 1 Loader(s) <br />Unit cost: 57.377 /LCY Total job cost: $111 <br />