Laserfiche WebLink
CIRCES Cost Estimating Software <br /> WHEEL LOADER -LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task # : 001 Slate :Colorado Permitfob #: M-2005.065 <br />Dale: 02/28/2006 County:San JUan Abbreviation :none <br />User: WHE Site :Upper Animas Sand & Gravel Filename : MO65-007 <br />Agency or organization name : DMG <br />Permit or other job action :710c applicaflon review <br />rack description :Topsoil replacement for lands affected during first year of <br />HOURLY EQ UIPMENT COST Basic machine :CAT446B (2004) Horsepower : 702 <br /> Attachment no.l :ROPS Cab Shift basis : /per day <br /> Data source : (GRG} <br /> Utilization <br /> Cast Breakdown : Ownership costlhoun 513.47 NA <br /> Ope2ting cosUhour : 37874 700 <br /> Operator cost/hour . 33253 NA <br /> Total unit costlhoun $64.13 Total fleet cost/hour : $84.13 <br />MATERIAL QUANTITIES <br />Inifial Swell Final <br />volume: 7,270 LCY factor : NA volume: 1,210 LCY <br />Source of quantity takeoff : /1ac)/43560s1/a!)f0.75'Dp27 = 1270 cy <br />Source of estimatetl swell factor : NA <br />HOURLY PRODUCTION ~ (Cat HB) <br />Loader Cvcle T'me Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) ~ Source <br />Maleriai:Mixedma[ena! 0.020 (Caf HB) <br />Slockpile:Gonveyor or dozer pried fO R. high and up 0.000 (Cat HB) <br />Truck ownership:No adjustmenh factor not applicable 0.000 (Cat HB) <br />Operalion:Consfant operation -0.040 (Cat HB) <br />Dump target No adjustment-(actor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment: 17.020 minutes <br />Adjusted basic cycle time : 0.455 minutes <br />Rollinc Resistance - Roatl Contlitions <br />Haul :Loose sand <br />Return :Loose sand <br />Haul and Return Time length Grade res. <br />(feet) (%) Rolling res. <br />(%) Total res. <br />(%} Travel time <br />(minutes) Data <br />Source <br />Haul route : 200 0.00 10.00 70.00 0.2257 ~ (Cat HB) <br />Return route : 200 0.00 70.00 70.00 0.2257 (Cat HB) <br />Loader Bucket CaoaciN <br />Rated capacity <br />Bucket fill factor <br />Adjusted capacity <br />1.50 LCY (heaped} (Cat HB) <br />1.050 Other-moist loam (7 <br />1.58 LcY <br />Total travel time : 0.4502 minutes <br />Total cycle time: 0.905 minutes <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.97 (Cat HB) <br />Stfe alfifude: 9,720 feet Job efficiency factor: 0.83 (i shiWday) <br /> Net corcection: 0.76 multiplier <br />Unadjusted hourly unit production : 104.40 LCY/Hr <br />Adjusted hourly unit production : 78.85 LCY/Hr /Cat HB) <br />Adjusted hourly Fleet production : 78.85 LCY/Hr <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: 15.35 Hours <br />Unit cost: $0.813 /LCY Total job cost: $9$4 <br />