My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE70140
DRMS
>
Back File Migration
>
Permit File
>
800000
>
PERMFILE70140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:16 PM
Creation date
11/20/2007 11:13:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005065
IBM Index Class Name
Permit File
Doc Date
2/28/2006
Doc Name
Approval of 110c Application
From
DMG
To
Charles Ponchak
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name :DMG <br />Permit or job action :110c <br />review <br />TASK LIST (DIRECT COSTS) ~ <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK I <br />HOURS DIRECT <br />COST <br /> <br />001 -Topsoil replacement for lands affected during first year of operations loader 1 15.3 $984 <br />002 -Carry 80.6 cy riprap to spillway location loader 1 1.73' $111 <br />003 -Prepare spillway for riprap excavate 1 3.1 $187 <br />004 -Place riprap in spillway excavate 1 6.7 $408 <br />005 -Carry 101.8 cy riprap to inlet location loader 1 2.3 $147 <br />006 -Prepare inlet for riprap excavate 1 3.9 $236 <br />007 -Place riprap in inlet cut excavate i 8.4 $512 <br />008 -Carry 69.4 cy riprap to west bank location loader 1 1.5 $100 <br />009 -Prepare west bank for riprap excavate 1 2.6 $161 <br />010 -Place riprap in west bank cui excavate 1 5.7 ~ $349 <br />011 -Revegetate lands affected during the first year of operations revege 1 8.0 $1,261 <br />012 -Haul reclamation equipment to and from job site mobilize 3 6.8 $1,961 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 66.4 $6,417 <br />'includes inflation factor adjustment of : NA °/a <br />INDIRECT COSTS <br />TOTAL DIRECT COST'= $6,417 <br />OVERHEAD AND PROFIT - LIablllty IOSUranOe : 2.02 % Of dlreCf total = $130 <br />Performance bond : 1.05 % of direct total = $67 <br />Job superintendent : NA* NA NA total = NA <br />Profit : 10.00 % of direct total = $642 <br />'not required (or eqp. operator serves as super.) TOTAL 0 & P = $839 <br />LEGAL -ENGINEERING • PROJECT MANAGEMENT - CONTRACT AMOUNT (direct ~ O & P) _ $7,256 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $363 <br />CONTINGENCY- NA* NA total= NA <br />'contingencies accountetl /or of task level TOTAL INDIRECT COST = $1,201 <br /> TOTAL BOND AMOUNT (direct+ indirect) _ $7,618 <br />
The URL can be used to link to this page
Your browser does not support the video tag.