My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69894
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:00 PM
Creation date
11/20/2007 11:06:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985212
IBM Index Class Name
Permit File
Doc Date
4/11/1986
Doc Name
SPECIAL REVIEW FINDINGS AND RESOLUTION CONCERNING THE PETITION OF NEIL & ARLIS SPRAGUE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Special Review <br />Neil C. and Arlis M. Sprague • <br />Page -6- <br />3. Conditions on road impacts and traffic: <br />a. The owners must agree in writing to comply with the requirements <br />of the County Engineering Department regarding access permits and the C unty Offsite <br />Road Development Policy for mining operations. This applies to all q arry traffic, <br />including removal of loose rock or rubble. <br />b. Other conditions pertaining to hauling of loose rock From existing <br />i <br />rubble piles: <br />(I) The contractor shall contact John Niemela, Tr ffic Control <br />Coordinator for Larimer County, prior to commencing hauling. The coot actor will be <br />responsible for placement of proper signing on County Road 27 to warn of ucks turning <br />onto highway. All signing will be in accordance with the manual on un form traffic <br />control devices as approved by John Niemela. <br />(2) No parking, loading or unloading of any veh Iles will be <br />allowed within the County right-of-way. ~ <br />(3) Trucks shall not back onto the County road. <br />(4) All trucks will be subject to existing state statutes for <br />maximum weight. No overweight permits will~be issued, and Larimer Co ty reserves <br />the right to spot check weight on loaded trucks. <br />(5) The contractor is responsible for prompt, compete removal <br />of any material that spills onto the roadway. r <br />(6) All hauling must be completed prior to end of each school <br />year, and it is preferred that all hauling be completed prior to May 1 in orde to limit the <br />impact of excessive truck traffic on tourist traffic. <br />(7) The contractor shall notify the State Highway D partment of <br />
The URL can be used to link to this page
Your browser does not support the video tag.