My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69866
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:00 PM
Creation date
11/20/2007 11:05:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007035
IBM Index Class Name
Permit File
Doc Date
9/5/2007
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Glen Sessions & Sons, Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />_. <br />PROJECT IDENTIFICATION <br />Task # : 04a State :Colorado PermiUjob# : M-2007-035 _ <br />Date : 09/05/2007 County :Jackson Abbreviation :none <br />User : GRM Site ;Bond Pit Filename :M035-04a <br />Agency or organization name :DRMS <br />Permit or ocher job action initial Reclamation Liability Estimate <br />Task description :push topsoil over reclaim areas <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8SU (200: Horsepower : 31__0_ <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br />Operating cost/hour : $73.75 100 <br />Ripper op. cosUhour : $0.69 10 <br />Operator cosUhour : $32.78 NA <br />Total unit cosUhour : $165.46 Total fleet cosUhour : $165.46 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 16,422 LCY factor : NA volume : 16,422 LCY <br />Source of estimated volume :applicant provided volume <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Matedal consistency description <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />16.50 % (ne <br />8.100 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.161 /LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility : <br />Job efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />1 Adjusted fleet production <br />Total job time <br />Total job cost <br />0.75 (avg.) <br />1.20 (Cat HB) _ <br />1.00 (gen.) _ <br />1.00 (avg.) <br />0.83 (1 shift/day) <br />0.80 (fnd-rf) <br />1.36 (Cat Hl3) <br />1.00 (Cat HB) <br />0.90 (Cat H8J <br />1.00 (S/SU/U) <br />1025.06 LCY/hr <br />1,025.06 LCYIhr <br />16.02 Hours <br />$2, 651 <br />
The URL can be used to link to this page
Your browser does not support the video tag.