Laserfiche WebLink
CIRCES Cost Estimating Software <br /> BULLD02ER WORK <br />PROJECT IDENTIFICATION <br />Task # : 03a State :Colorado PermiUjob# :M-2007-035 <br />Date : 09/05/2007 County :Jackson Abbreviation :none <br />User : GRM Site :Bond Pit Filename : M035-03a <br />Agency or organization name :DRMS <br />Permit or other job action :Initial Reclamation Liability Estimate <br />Task description :push overburden back into place <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series ll - 8SU (200: Horsepower : 310 _ <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source ; (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br />Operating cosUhour : $73.75 100 <br />Ripperap.cost/hcur : $1.71 25 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $166.49 Total fleet cosUhour : $166.49 <br />., - :r :.~ <br />MATERIAL QUANTITIES -:. ..- .. ,: . ~: <br />Initial Swell Loose <br />volume : 49,266 LCY factor : NA volume : 49,266 LCY <br />Source of estimated volume :estimate provided by applicant <br />Source of estimated swell factor :NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feei <br />Unadjusted hourly production : 1,400.0 LCY/hr <br />Material consistency description <br />Loose stockoile <br />Average push gradient : 16.50 % (r <br />Average site altitude : 8,1 DO feet <br />Material weight <br />Weight description <br />Earth -Dry packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozer{s) <br />Unit cost : $0.162 /LCY <br />2,550 Ibs/LCY <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.20 (Cat HB) <br />Dozing method : 1.00 (gen.J <br />Visibility : 1.00 (avg.) <br />Job efficiency : 0.83 (1shift/day) <br />Spoil pile : 0.80 (fnd-rt) <br />Push gradient : 1.36 (Cat HB) <br />Altitude : 1.00 (Cat H8J <br /> <br />Material weight : <br />0.90 _ <br />(Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.73 <br /> <br />Adjusted unit production : 1025.06 LCY/hr <br />Adjusted fleet production : 1,025.06 LCY/hr <br /> <br />Total job time : 48.06 Hours <br />Total job cost : $8,002 <br />