My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE69866
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE69866
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:19:00 PM
Creation date
11/20/2007 11:05:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007035
IBM Index Class Name
Permit File
Doc Date
9/5/2007
Doc Name
Initial reclamation liability estimate
From
DRMS
To
Glen Sessions & Sons, Inc
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinla Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task #: 05a State :Colorado PermiUjob#:M-2007-035 <br />Date <br />User <br />County :Jackson <br />Site :Bond Pit <br />Abbreviation :none <br />Filename : M035-05a <br />09/05/2007 <br />GRM <br />Agency or organization name :DRMS <br />Permit or other job action :Initial Reclamation Liability Estimate _ _ _ <br />Task description :push 1000 cu/yds of plant materials back into place <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series II - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $58.24 NA <br /> Operating cosUhour : $73.75 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $164.77 Total Fleet cosUhour : $164.77 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,000 L CY factor : NA volume: 1,000 LCY <br /> <br />Source of estimated volume :applicant pro vided volume __ <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 1.20 (Cat HB) <br />Unadjusted howdy production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1 shift/day) <br />Loose stockpile Spoil pile : 0.80 (fnd-r!) _ <br /> Push gradient : 1.36 (Cat HB) <br />Average push gradient : 16.50 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 8,100 feet Material weight : 1.10 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight 2 100 Ibs/LCY Net correction : 0.89 <br />Weight description ; <br />Earth -Loam <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.132 /LCY <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />1244.72 LCY/hr <br />1,244.72 LCY/hr <br />0.80 Hours <br />$132 <br />
The URL can be used to link to this page
Your browser does not support the video tag.