Laserfiche WebLink
Revised Jan. 16, 1985 <br />• Appendix C. <br />Vegetation will not be cleared for more than the width necessary to serve <br />traffic and utility needs. Maintenance of the road will be sufficient to <br />ensure minimization of erosion for the life of the road. <br />3.3 ELECTRICAL POWER <br />A power line from the substation at the Mt. Gunnison No. 1 Mine will be <br />constructed along the route shown an Drawing No. SGF-03 to the fan site. <br />The route will be along existing roads to minimize new disturbances. The <br />first portion of the power line will be placed in conduit and buried. The <br />• second portion, along the Sylvester Gulch road, will be placed overhead on <br />poles. <br />• <br />