Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 026 <br />Date : 11/OB/2006 <br />User: JRS <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Mine <br />Permifrob # :C-1981-012 <br />Abbreviation :none <br />Filename : C012-026 <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Partial Phase I Bond Reloase SL-02 -Releasable Amounts <br />Task description :Rip Water Tank Bench <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 : 1-shank ripper <br /> Data source : (CRG) <br />0 <br />Cost Breakdown : Ownership cosUhour <br />Dozer operating cosUhour <br />Ripper operating cosUhour <br />Operator cosUhour <br />Total umt cosUhour <br />MATERIAL QUANTITIES <br />• <br />Uhl¢anon /o <br />$51.70 NA <br />$93.54 100 <br />$17.26 100 <br />$31.76 NA <br />$188.26 Total fleet cosUhour: $564.78 <br />Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 2.03 acres Rip depth (ft) : 2.00 Volume : 6,550 BCY or CCY <br />Source of estimated quantity :Map 11 <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />Unadjusted production <br />per selected method <br />338.16 cu. yds./hour <br />Area : Avg. ripping depth : 4.05 feeUpass Site altitude : 7 <br />500 feet <br />Average ripping width : <br />A 6.08 feet/pass Altitude adjustment : , <br />1.00 <br />(Cat HB) <br />vera a ri g g <br />g ppin len th : <br />A 200.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br />verage dozer speed : <br />A 88.00 feet/minute Net job correction : 0.83 multiplier <br />verage maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.664 acreslhour Adjusted unit production : 3,600.67 cu. yds.lhour <br />Unadjusted production : 4 338 16 cu yds /hour Adjusted Fleet production : 10,802.02 cu. yds,/hour <br />• JOB TIME AND COST "` <br />Fleet size : 3 dozers) Total job time . 0.61 hours <br />Umt cost : $0 052 <br />,~....mTm per cu yd. <br />.. Total job cost : <br />,, ,,, $342 <br /> ,..:. <br />