My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-11-16_PERMIT FILE - C1981012A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2006-11-16_PERMIT FILE - C1981012A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2017 10:05:15 AM
Creation date
11/20/2007 10:56:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
11/16/2006
Doc Name
Partial Phase I Bond Release
Section_Exhibit Name
Exhibit 28 Appendix A Part 3
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capaciri <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis <br />Material weight : 2,550 pounds/LCY 00 LCY <br />Material description <br />Earth -Dry packed <br />Rated payload : 48,000 pounds <br />Payload capacity : 18.82 LCY <br />Struck volume . 14. <br />Heaped volume : 20.00 LCY <br />Average volume : 17.00 LCY <br />Adjusted capacity : 17.00 LCY "' <br />hourty production reflects volume per scraper pair on push-pull models <br />Cvcle Time : Job Condition C orrections : Site altitude (ft.) : 7,500 <br /> Scraper Push dozer Source <br />Scraper loading time " : 0.40 minutes Altitude adj.: 1.000 1.000 (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 0.830 (Cat HB) <br />'load time per scraper pair on push-pull models Net CArreCllOn : 0.830 0.830 <br />Travel time <br />Road condition description :Firm, smooth, rolling, dirUlt. surfaced, watered, maintained <br />Haul Route <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)" <br />1 5,000 -6.00 3.00 -3.00 2938 1.75 <br /> <br /> <br /> <br /> <br />• <br />Haul time : 1.75 minutes <br />Return route <br />minutes <br /> <br />[able velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 5.43 minutes <br />Unadjusted unit production/hour : 187.89 LCY/hour *" Adjusted forjob conditions : 155.95 LCY/hour <br />Optimal number of scrapers per push dozer : 7 Selected number of scrapers : 2 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 311.90 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 311.90 LCY/hour <br />JOB TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 31.80 Hours <br />Unlt cost : $1.753 /LCY Total job cost $17,387 <br />E~(z8 ~~3 !/ od' ~7 69/13/ob St•OZ <br />'• travel time ror each segment is adjustetl for accelerelion/deceleralion. Return tlm8 : 2.67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.