My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE68280
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE68280
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:13:57 PM
Creation date
11/20/2007 10:17:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977304
IBM Index Class Name
Permit File
Doc Date
9/30/1977
Doc Name
REGULAR 112 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br />• RECLAMATION PLAN <br />The affected land shall be reclaimed to it's original land use <br />of limited wild life habitat. Due to the severity of slope of <br />the terrain and hard rock outcropping it would not be <br />applicable to other productive uses. <br />General reclamation plan is to backfill the quarried areas with <br />the sandstone overburden, level and grade the overburden to a <br />slope of 2 to 1 or less and revegetate with a mixture of Bitter- <br />grass, Mountain mahogany, Rabbit brush, Indian ricegrass and <br />sand drop seed. The seed will be hand broadcast at 18 lbs, per <br />acre in the spring. <br />• The method of backfilling the quarried area with sandstone over- <br />burden was chosen as the best means of achieving reclamation of the <br />affected land for two main reasons. <br />1. The sandstone overburden will consist of sufficient <br />quantity of fine material which will allow root growth <br />of grasses, shrubs, and possibly Pinon pine trees. The <br />quarried area would otherwise be barren hard rock with <br />no, or very little chance for any revegetation. <br />2. The sandstone overburden must be removed to obtain the <br />marketable limestone and therefore must be disposed of. <br />If not replaced in the disturbed areas it would require <br />the additional disturbance of many acres. <br />The proposed post mining land uses will be very compatible with <br />• similar terrain in the vicinity. The steep barren hogback for- <br />orations do not have any productive use ocher than occasional and <br />
The URL can be used to link to this page
Your browser does not support the video tag.