Laserfiche WebLink
of 2' to 20'. This phase will reyulre 60 mouths. The <br />• ~ approximate area worked at this time will be 12 acres. <br />Phase VI Limestone will be quarried from Area 4. Reclamation will <br />begin on areas 5, 6 and 7. The overburden piles will be <br />leveled and graded to a slope of 2 to 1 end following the <br />easterly sloping terrian. Seeding of a mixture of <br />Bittergrass, Mountain mahogany, Rabbit brush, Indian rice- <br />grass~Western wheat grass and sand dropaeed at 18 lbe per <br />acre. This will be accomplished by hand broadcasting. <br />This phase will require 60 months. The approximate area <br />worked at this time will be 17 acres. <br />Phase VII Areas 1, 2, 3 and 4 will be reclaimed by leveling and <br />contouring the overburden stockpiles to a slop o1 2 to 1 <br />or less and following the easterly sloping terrian, <br />. seeding of a mixture of Bittergrass, Mountain mahogany, <br />Rabbit brush, Indian ricegrass, Western wheat grass, and <br />sand dropseed will be accomplished by hand broad casting. <br />This phase will require 60 months. The approximal area <br />worked at this time will be 34 acres. <br />./ <br />