Laserfiche WebLink
5. Samples will be analyzed for the following parameters: <br />Suaaested Water Oualitv Parameters* <br />pH (field) Phosphate (PO ', as P) <br />Conductivity at 25°C (field) Sodium (Na') <br />Temperature (field) Sulfate (SO,~) <br />Total Suspended Solids Aluminum (A1) <br />Total Dissolved Solids <br />Oil and Grease (visual) <br />Sodium Adsorption Ratio <br />Bicarbonate (HCO ,) <br />Calcium (Ca") <br />Chloride (C1-) <br />Magnesium (Mg ') <br />Nitrate - Nitrite <br />Selenium (Se) <br />Arsenic (AS) <br />Cadmium (Cd) <br />Copper (Cu) <br />Iron (Fe) <br />Lead (Pb) <br />Manganese (Mn) <br />Mercury (Hg) <br />Molybdenum (Mo) <br />Zinc (Zn) <br />*Total species concentration (dissolved and <br />suspended) From CMLRD Guidelines for the Collection <br />of Baseline Water Quality and Overburden Geochemistry <br />Data. <br />D. Data Processing and Reporting <br />1. Copies of the field and laboratory data sheets will be <br />sent quarterly to the CMLRD. <br />2. Data will be summarized in the annual hydrology report to <br />CMLRD. <br />II. Sedimentation Pond Discharge Samoling (NPDES) <br />A. Monitoring Locations <br />NPDES Discharge Point 002 (Mine) at outlet from Sedimentation <br />Pond No. 4 on tributary to Newlin Creek <br />NPDES Discharge Point 003 (Mine) for mine water system <br />(Freshwater Pond No. 3) on Magpie Creek diversion <br />NPDES Discharge Point 004 (Mine) at outlet from Sedimentation <br />Pond No. 5 on tributary to Newlin Creek <br />NPDES Discharge Point 001 (Loadout) at outlet from <br />Sedimentation Pond L-1 on Chandler Creek <br />NPDES Discharge Point 002 (Loadout) at outlet from <br />Sedimentation Pond L-2 on Oak Creek <br />B. Samolina Frequency and Procedure <br />1. Selected water quality parameters and flow will be <br />measured weekly during periods of active discharge <br />2. Water quality samples will be collected monthly if <br />discharge is occurring <br />