Laserfiche WebLink
• Western Fuels-Colorado <br />Reclamation Cost Summary Form <br />PERMIT NUMBER; C-81-008 PREP. BY: ROSS L. GUBKA, P.E. <br />Date: 10-8-97 OPERATION: NEW HORIZON MINE #2 <br />GRAND TOTAL OF BOND AMOUNT: 51.332.001 <br />I. DIRECT COST <br />A. EARTHWORK - BACKFILLING & ROUGH GRADING <br />TASK No. Task Description Cost ($) <br />1 Haul Boxcut Material from Stockpile to Pit $270,334 <br />2 Grade Boxcut Material Placed in Pit $33,352 <br />3 Grade Existing Spoil Piles $1,007 <br />4 Remove Matrial from Facility Area & Haul to Pit $30,089 <br />28 Grade Pit Turn Slot Cut Highwall Material $10,349 <br />29 Grade Backfilled Material associated w/Pit Turn $148,432 <br />~ ~ subtotal (A1 493 563 <br />B. EARTHWORK - HIGHWALL REDUCTION <br />TASK No. Task Description Cost ($) <br />5 Highwall Reduction $4,895 <br />27 Rip Hightwall Associated w/Pit Turn Slot Cut $2,656 <br />subtotal IBI 7 551 <br />C. EARTHWORK -WASTE PILE COVER PLACEMENT <br />TASK No. Task Description Cost ($) <br />N/A <br />subtotallCl <br /> <br />C:\DATA\OPRO\PERMIT\96PERMIT\REVISION\BON DCALa. W61 <br />