<br />TABLE 3.02.2
<br />ESTIMATED RECLAMATION COSTS FOR THE NEW HORIZON MINES
<br />1. Dired Cost
<br />Backfilling & Rough Grading
<br />Highwall Reduction
<br />Waste Pile Cover Placement
<br />Fill Compaction
<br />~PWn9
<br />Road Redamation
<br />Finish Grading
<br />Stream Channel Reconstruction
<br />Final Pit Backfill & Grade
<br />Rip Road Surfadng
<br />Stream Channel Reconstruction
<br />Drainage Control System Install/Remove
<br />Topsoil/Subsal Replacement
<br />Portal/Shaft Sealing
<br />Spoil Sampling
<br />Rill & Gully Repair
<br />Construct, Main. & Operate Flood im.
<br />Monitoring VIII Sealing
<br />Seal Monitoring W~IIs
<br />Rill & Gully Repair
<br />Miscellaneous Redamation
<br />Weed Control
<br />Dertalition
<br />Seeding
<br />Fendng
<br />MOB/DEMOB
<br />Trial Direct Reclamation Cast
<br />Contractors Ovedread & Profit
<br />Public Liability Insurance
<br />Contractors perfomence Bond
<br />Contractors Profit
<br />Job Superintendent
<br />DMG Project Adrrrin Expense
<br />Project Engineering Fee
<br />Staff Adrrvn. Expense
<br />Total Irxired Redartation Cost
<br />Total
<br />'See ATTACHMENT 3.02.2-1 for details
<br />See ATTACHMENT 3.02.2-2 for details
<br />New New Total
<br />Horizon Horizon
<br />One' Tvao~
<br />WA $493,563 $493,563
<br />WA 7,551 7,551
<br />WA WA
<br />WA WA
<br />$2,948 21,167 21,167
<br />WA 97,571 97,571
<br />WA 2,085 2,085
<br />WA 615 615
<br />WA WA WA
<br />WA WA WA
<br />WA WA WA
<br />16,665 7,376 24,041
<br />WA 143,173 143,173
<br />WA 2,000 2,000
<br />WA 10,000 10,000
<br />WA 12,0 12,000
<br />3,999 4,097 8,096
<br />10,000 WA 10,000
<br />2,000 WA 2,000
<br />WA 127,009 127,009
<br />83,160 88,214 171,374
<br />6,217 26,048 32,265
<br />$124,989' $1,054,624 $1,179,613
<br />1,937 16,347 18,284
<br />1,219 10,283 11,502
<br />12,499 105,462 117,967
<br />5,545 18,715 24,260
<br />11,695 72,326 84,021
<br />8,494 54,244 62,738
<br />$41,389 $277,377 $318,766
<br />$166,378' $1,332,0012 $1,498,379
<br />• (REVISED 9-597) 3,Q2,2_2