Laserfiche WebLink
D. EARTHWORK -FILL COMPACTION <br />'ASK No. Task Description <br />N/A <br />E. EARTHWORK -RIPPING <br />TASK No. Task Description <br />6 Rip regraded Spoil Prior to Topsoil Replacement <br />7 Rip Haul Road Material 3' Deep <br />8 Rip facility Area <br />25 Rip Perimeter Road Material 3' Deep <br />•. EARTHWORK -ROAD RECLAMATION <br />TASK No. Task Description <br />9 Remove Ripped Surfacing Material & Haul to Pit <br />10A Compact 2' subbase for Reconstructio County Road <br />106 Grade reconstruced County Road Base <br />10C Gravel for County Road ($11.95/cy * 3,900 cy) <br />Has been completed as of 10-8-97 10 Install Culvert on County Road (150'1' $39.5311f) <br />26 Remove ripped Material from Perimeter road& Haul <br />G. EARTHWORK -FINISH GRADING <br />TASK No. Task Description <br />11 Final Grade Disturbed Areas -include in B&G <br />i• <br />Cost ($) <br />subtotallDl <br />Cost ($) <br />$5,617 <br />$4, 594 <br />$8,482 <br />$2,474 <br />subtotal (EI 21 167 <br />Cost ($) <br />$21,387 <br />$1,232 <br />$1,164 <br />$46,605 <br />$0 <br />$27,183 <br />subtotallFl 97 571 <br />Cost ($) <br />$2,085 <br />subtotallGl 2 085 <br /> <br />C:\DATA\OPRO\PERMIT\96PERMIT\REVISION\BONDCALa. WB1 <br />