Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
5/19/2006
Doc Name
Annual Operation Plan 2006 Methane Drainge Project Panels 16-24
Section_Exhibit Name
Exhibit 80 Drilling Activities - MR334
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />20-25 USFS-Box Canyon 6 8/3/2006 8/9/2006 <br />21-25.5 USFS-Box Canyon 6 8/10/2006 8/16/2006 <br />21-28 USFS-West Flatiron 12 8/17/2006 8/29/2006 Includes 3 da. Mobe <br />20-38 USFS-West Flatiron 9 8/30/2006 9/8/2006 <br />20-36.5 USFS-West Flatiron 9 9/9/2006 9/18/2006 <br />20-31 USFS-West Flatiron 11 9/19/2006 9/30/2006 Long Reach Hole <br />Delays due to mechanical breakdowns, inclement weather, hole conditions, <br />operational requirements, and permit approval are not represented in the schedule. MCC <br />intends to utilize one drill rig to complete this schedule. <br />WATER SUPPLY SYSTEM <br />MCC will install and maintain a water supply system to provide water to the drill <br />sites and for dust suppression. This system will minimize, to a lazge degree, the need for <br />water skidders and water trucks to travel the temporary roads. The water supply system <br />will include, but is not limited to, flexible hosing, rigid piping, water pumps, and storage <br />tanks. <br />MCC will install the water supply system prior to, or as soon as possible after the <br />construction of the drill pads. The hosing and/or pipes will be placed along side of <br />existing roads wherever practical. The lines will be anchored to prevent damage due to <br />surging in the lines. Flexible hosing will be laid out cross-country to minimize total line <br />length and/or to maximize operational efficiency of the system. The cross-country route <br />would be from the Shaft Canyon Road to the reclaimed 14-07 pad. <br />The main waterline system will continue to utilize the existing portion of the road <br />above the Sylvester Gulch airshafts and will follow the proposed route of the Shaft <br />Canyon Road up to drill pad 24-08 and cross-country up the ridge to the 14-07 pad and <br />thence along this road to the West Bench Road to tie-into a portable water tank at the 22- <br />03 pad site and from there out the West Flat Iron Extension to 20-01/03 pad. Pumps may <br />also be situated at this site to distribute the water to service the LM-140 rig if needed. <br />Water for drilling the Box Canyon wells 20-21.5/25 and 21-25.5/28 would be <br />pumped from the North Fork of the Gunnison via flexible hosing up to the well sites. <br />The projected waterline, pump, and water tank locations aze provided on the <br />attached Map 3. MCC will identify and mazk the waterline alignments prior to installation <br />for review and approval by the responsible USFS representative. <br />STAGING AREAS <br />MCC will utilize existing drill pad locations for staging azeas. The staging azeas <br />will allow MCC to temporarily store equipment and supplies used in the drilling and <br />venting programs, and to store materials required for the continuing reclamation of past <br />drill sites and roads as well as the interim reclamation of new roads as they aze developed. <br />fir particulaz, MCC would store large quantities of certified weed-free straw for mulching <br />purposes to minimize traffic on the Minnesota Creek and Dry Fork roads. The ability to <br />l0 <br />