Laserfiche WebLink
• Coal Processing and Non-Coal Processing Wastes <br />There are no coal processing facilities nor are any proposed at the New Horizon 2 area. All of the <br />coal is transported to the power station by a transportation contractor. Reject rock from a rotary <br />breaker at the power plant may be transported back to the mine site and deposited in the pit at <br />least 10' below the subsoil level. <br />Non-coal wastes shall be periodically transported to the county landfill. Trees and brush removed <br />in the site clearing process may be chipped and used for mulch or pushed into an adjacent mined <br />out pit and buried. <br />• I <br />u <br />(REVISED MARCH 2006) 2.05.3-7 <br />