<br />Mining will be done at an average of 0.5 acres per year. <br />Reclamation caill be started in year 7 and continue at approximately <br />0.75 acres per year. <br />The time table for removal and replaced of the overburden <br />is outlined in the mining plan. Stripping will commence at year 1 <br />and continue through year 18. Replacement of the overburden <br />will commence at year 7 and continue until the deposit is depleted <br />at which time the remaining overburden will be replaced and <br />contoured to a 2:1 slope as indicated on the Final Contour <br />Reclamation map. Revegetation will begin in year 8 and continue <br />as grading is completed in each area. Complete reclamation will <br />be completed no later than 5 years upon abandonment of the quarry. <br />The final use of the land will be limited Erazin~; due to the <br />sparse vegetation. <br />