Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rufe 4.05.9(17) <br />Mine: New Elk ~/~#~ ~[-cUNlylpwl <br />NPDES ID. No.: None <br />Inspection Period: Second Quarter 2006 <br />Inspection Date: 06/12/06 <br />General Description or Refennnce to Site Plan: r~ ~/ <br />~(S Ce,n~1YJ(~l?e~ f7a.srw fs a /IoN-c[6G t+.f~rcry ~i-~Uc4 oQes~cr~d <br />~(7e1~ I`~'~ '~navi ~ friec~''Csor~h-~ Gt.~x/d'e~rd-+.r~- ~ene~ <br />EMBANKMENT <br />1). Adequacy of the vegetable cover. Excellent ode to Few Poor <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Extensive Some ~ None <br />Yes <br />No ~ <br />4). Erosion of the downstream tce of the embankment? Yes <br />Cause of erosion pn be attributed to: <br />No ~ <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />No ~~ <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />~~ <br />M HA Qualified Impoundm t Inspector <br />C~iZ/off <br />Date <br />No ~ <br />