Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk LJ)~# z ~'prt (ucNtytecL/ <br />NPDES ID. No.: None <br />Inspection Period: Second Quarter 2006 <br />Inspection Date: 06/12!06 <br />G~eneral Descripti nor Referepn~ce to Site Plan: <br />/t~IS Cpr~ cxrtnwtevl.{ ~rh ~~ev/t~ 4Je_~fw ~u <br />o~esr~~eO~ ~ka(~( Pu-w~ <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. cellen Moderate Few <br />2). Erosion forming Gullies: Extensive Some <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes <br />4j. Erosion of the downstream toe of the embankment? Yes _ <br />Cause of erosion can be attributed to: <br />5). Is seepage occuning through the dam? Yes <br />Could this seepage cause potential instability? <br />S''Fu~urhe~~ <br />Poor <br />None <br />No lr <br />No ~ <br />No~~ <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes No // <br />Explain: /J <br />OTHER OBSEyR/~VATIONS: ,~r.,~ Cain c i~/'y k~-~x a/" <br />MSHA Qualfied Impoundment Inspector <br />~~~~~6~ <br />Date <br />