Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk <br />NPDES ID. No.: None ~--, <br />Inspection Period: Second Quarter 2006 <br />Inspection Date: 06/12/06 <br />General Description or Reference to Site Plan: (( nr7 a <br />/~i+..F- (~ /S o~ t7m- ,vADt,.d~ ,2a,~-cQ[~Cran ~n ~.CL~ox25rocteK ~e <br />c~,..`fh;~, y10.K7~ proceu'rN c~-~(, iz,.~ ~k~ti~ been/// ivro~~'~ 7" <br />sr« ~ /4q!• ~~- ~~ t6 //m.J v6ac~~oQe ce~ - oC~ f ~^c0i ~r C~YaN -oo <br />EMBANKMENT <br />l). Adequacy of the vegetative cover. Excellent Moderate ~ Poor <br />2). Erosion forming Gullies: Extensive Some ~ None <br />3). Is wave action causing erosion: <br /> On the Upstream embankment? Yes No ~ <br />4). Erosion of the downstream toe of the embankment? Yes No <br /> Cause of erosion pn be attributed to: <br />5). Is seepage occurring through the dam? Yes No ~ <br /> Could this seepage cause potential instability'? <br /> <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br /> Yes No ~ <br /> Explain: <br />OTHER OBSERVATIONS: ~w_ of / <br />/~~~ <br />MSHA Qualified Impoundment In or <br />~~z/o <br />Date <br />