Laserfiche WebLink
<br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORK ~ <br />Pond GOLDEN EACLE NPDES 2(0. 004 <br />Date of Inapectionh1-3~ ~y% ' <br />EMSANICMENT <br />1. Adequacy of the vegetative cover: xcella , Moderate, Few, Poor <br />2. Erosion forninq gullies: Extensive, Some, Very Few, one <br />3. is wave action causing erosion: <br />On the upstream embankment? Y'ea Ho x <br />At the principal spillway inlet? Y'ea No <br />4. Erosion of the downstream toe of the embankment? Yea No x <br />The cnuae of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yea No ,C If yes <br />could this seepage cnuae potential instability7~ Yea No u <br />Explain• <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yea~_No <br />2. Is the inlet free of debris and restrictive material?Yaa~No <br />3. Is the discharge outlet tree of restrictive material? Yea x No_ <br />4. is erosion occurring at the discharge outlet? Yes No x if <br />yes, <br />;~ evaluate the severity: Extensive. Nodernte Just starting on <br />EMERGENCY SPILLMAY ' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yas~_No <br />2. Does it appear as if the emergeney'spillway has discharged water <br />since the last inspection? Yes No~[_ <br />3. Is erosion occurring at any auction of the emergency spillway? <br />Yea No_,,,~[_ Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design .storage capacity of the reservoir been surpassed? <br />Yea No~_ If yea, <br />explnin• ~ <br />~ ,_,:' Please add any special coaMenLe.concsrning potentially dangerous <br />problems on the back of this sheet. <br />rri / <br />Inspector C ~~-G: <br />s~ <br />