My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO28423
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO28423
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:47:38 PM
Creation date
11/20/2007 9:23:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
1/12/1995
Doc Name
4th Qtr 1994 Inspections
From
BASIN RESOURCES INC
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• BASIN RESOURCES, INC. <br />' SEDIMENTATION POND INSPECTION FORM' <br />i <br />POnd GOLDEN EACLE GE_ 002 <br />NPDES Mo. . <br />~ Date of Inspection ~?,-3ori`I <br />EMBANKMENT <br />1. Adequacy of the'vegetative cover: Excellent, Moderate, Few, ooi <br />2. Erosion forming gullies: Extensive, Somme, Vezy Few, lfone <br />3. Is wave action causing erosion: <br />On the upstream embankment? 'Yea No ,% <br />At the principal spillway inlet? 'Yee No_~ <br />4. Erosion of the downatreem toe of the embankment? Yee No X <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yee Ho~_ If yes <br />could this seepage cause potential instability?~ Yes No~_ <br />Explain• <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yas_~No <br />2. Is the inlet free of debris and restrictive material?Yes ~No <br />~ 3. Ia the discharge outlet free of restrictive material? Yes_~No_ <br />4. Is erosion occurring at the discharge outlet? Yes No_ c if <br />yes, <br />.zt evaluate the severity: Extensive. Moderate Just starting <br />EMERGENCY SPILLMAY ' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yes_~_No <br />2. Does it appear as if the emergancy'spillway has discharged water <br />since the last inspection? Yea No~_ <br />3. is erosion occurring at any section of the emergency spillway? <br />Yes No / Describe the <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the raservoi:• been surpassed? <br />Yea No~_ If yes, N 2 ~ ~~ <br />explain: Pown.c,+sG 1;,9~tc` au f" .ri.Js L'sstfdsl ~ <br />,~Y'l~4Ns-~ ue/~ <br />~. ~k: Please add any epscial cosments concerning potentially dengeroua <br />problems on the back o! this sheet. <br />Inspsctor_~~/curi~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.