Laserfiche WebLink
BASIN RESOURCES, INC. - <br />SEDIMENTATION POND INSPECTION FOR!! <br />POrtd GOLDEN EAGLE NPDES po. 005 <br /> <br />~ Date of Inspection /~-3o-5y ' <br />EMBANlCMLNT <br />1. Adequacy of the vegetative cover: Excellent, Lf4odera~ Few, Poos <br />2. Erosion forming gullies: Extensive, Some, Very Few, onE <br />3. Is wave action causing erosions <br />On the upstream embankment? 'Yea No X <br />At the principal spillway inlet? 'Yee No~_ <br />4. Erosion of the downstream toe of the embankment'? Yes No_~ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yes _ No X If yes <br />could this seepage cause potential instability? Yes No_~, <br />Explain: <br />PRINCIPAL SPILLMAY <br />1. is the principal spillway system in working order.T Yas X !fo <br />2. Ia the inlet free of debris and restrictive ssaterial?Yes~No <br />3. Ie the discharge outlet free of restrictive material? Yes~NO_ <br />4. Is erosion occurring at the discharge outlet? Yes No~_If <br />yes, <br />;t` evaluate the severity: Extensive Nodernte Just starting None <br />EMERGENCY SPILLMAY ' <br />1. Is the overall emergency spillway system capable of passing <br />design storm discharge? Yes~i _No <br />` 2. Does it appear as if the emergency'spillway has discharged water <br />since the last inspection? Yea No~_ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yes No_7~ Describe the <br />extent <br />SEDIMENT 3TOAAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed? <br />Yes Nom. If yes, <br />explnin: ~ <br />'~ :~; <br />~ ~ Please add any special comq:ents concerning potentially dangerous <br />problems on the back of thi^ sheet. // <br />Inspector_~~~~.~•a _ <br />