Laserfiche WebLink
• BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FOR!! <br />GOLDEN EAGLE RIVER POND ~ ' <br />Pond NPDE3 No.. - <br />Date of Inspection /.,7 .3~-yy ' <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: xcellant ![oderate, Few, Pow <br />2. Erosion forming gullies: Extensive, Sons, Very Few, lfon~ <br />3. is wave action causing erosion: <br />On the upstream embankment? Yes No_~/~ <br />At the principal spillway inlet? Yea No A _ <br />4. Erosion of the downstream toe of the embankment.? Yes No X <br />The cause of the erosion is attributed to: <br />5. Ia seepage occurring through the den? Yee No_~ If yea <br />could this seepage cause potential instability? Yes Nom! <br />Explain• <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yea~No~ <br />2. Is the inlet free of debris and restrictive material?Yes~_No_ <br />3. Ia the discharge outlet Tree of restrictive material? Yes~No_ <br />• 4. Is erosion occurring at the discharge outlet? !es No X If <br />yes, <br />.,~i evaluate the severity: Extensive Moderate Just starting NonE <br />EMERGENCY SPILLMAY ' <br />"~ 1. is the overall emergency spillway system capable of passing <br />design storm discharge? Yes ~No <br />e.~ <br />2. Does it appear as if the amergency'spillway has discharged water <br />since the last inspection? Yes No~_ <br />3. Is erosion occurring at any auction of the emergency spillway? <br />Yea No~_ Describe the' ' <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir bean surpassed? <br />• Yes No~_ Ii yes, <br />explain: ~ <br />~ ~•4;.. Please add any special.coements concerning potentially dangerous <br />problems on the back of this sheet. <br />Inspector~F ~^ <br />