Laserfiche WebLink
<br />AREA OPERATION <br /> <br />6 BacMill Road <br />6 Revegetation <br /> SUBTOTAL AREA 6 <br />7 Backiill Pond <br />7 Revegetation <br /> SUBTOTAL AREA 7 <br />8 Cement 7 Drill Holes <br />8 Backfill 23 Drill Holes <br /> SUBTOTAL AREA e <br />Table 2.05.4(2)(b)-4 (cont.) <br />REMAINING RECLAMATION COSTS <br />UNIT <br />QUANTITY UNIT PRICE AMOUNT TOTAL <br />No additional road reclamation required. <br />Pond reclamation no longer required. <br />28 HRS. $ <br />23 HRS. <br />TOTAL DIRECT COST; REMAINING RECLAMATION <br />• INDIRECT COSTS: <br />Construction Supervision 51 HRS. <br />Engineering Costs <br />1. Engineering and bid document preparation <br />2. Engineering services contractor insurance <br />TOTAL REMAINING RECLAMATION COSTS <br />TOTAL COMPLETED AND REMAINING RECLAMATION COSTS <br />• TABLE2 <br />115 $ 3,220 <br />100 2,300 <br />$ 5,520 <br />$ 5,520 <br />20 1,020 <br />4.25% 235 <br />1.75% 97 <br />$ 6,871 <br />$136,956 <br />(Rev. 03-29-96) <br />