Laserfiche WebLink
Table 2.05.4(2)(b)-4 <br /> COMPLETED RECLAMATION COSTS <br /> UNIT <br /> AREA OPERATION QUANTITY UNIT PRICE AMOUNT TOTAL <br /> <br /> 1 Mobilization 1 L.S. $ 2,500 $ 2,500 <br /> 1 Place Cover Material 33,013 C.Y. 1.48 48,859 <br /> 1 Caver Material Salvage 675 C.Y. 1.5 1,011 <br /> 1 Slope Borrow Area 9,016 C.Y. 1.1 9,918 <br /> 1 Ravegetalion 11.22 ACRE 626 7,024 <br /> SUBTOTAL AREA 1 $ 69,312 <br /> 2 Conlour Coal Yard 1 L.S. $ 3,000 $ 3,000 <br /> 2 Place Growth Media 8,606 C.Y. 1.5 12,909 <br /> 2 Contour Storage Yard 1 L.S. 2,300 2,300 <br /> 2 Revegetation 6.68 ACRE 626 4,182 <br /> SUBTOTALAREA2 $ 22,391 <br /> 3 Contour Fan Site 1 L.S. $ 1,400 $ 1,400 <br /> 3 Contour Office Area 1 L.S. 400 400 <br /> 3 Revegetation 3.28 ACRE 626 2,053 <br />• SUBTOTAL AREA 3 $ 3 <br />853 <br /> , <br /> 4 Powder Magazine 8 Road 1 L.S. $ 300 $ 300 <br /> 4 Revegetation 1.41 ACRE 626 881 <br /> SUBTOTAL AREA 4 $ 1,181 <br /> 5 Major Drainage Channel 1 L.S. $ 11,688 $ 11,688 <br /> SUBTOTAL AREA 5 $ 11,688 <br /> <br /> TOTAL DIRECT COST; 1988 COMPLETED RECLAMATION $108,425 <br /> INDIRECT COSTS: <br /> Construction Supervision 15,155 <br /> Engineering Costs <br /> 1. Engineering and bid document preparation 4.25% 4,608 <br /> 2. Engineering services contractor insurance 1.75% 1,897 <br /> <br /> TOTAL COMPLETED RECLAMATION COSTS $130,085 <br />. TABLEI (Rev.03-29-96) <br />