Laserfiche WebLink
_ Information included stream alpha lists, water <br />decrees, well permits and surface-water diversion <br />records; <br />c. field verification of the existence and condition <br />of key components of the Hiqhline Canal and its <br />laterals, headgates, turnouts, and split boxes. The <br />locations of potentially impacted water rights were <br />also verified in the field; <br />d. review of the water requirements during and after <br />mining; <br />;• e. assessment of the potential impact to water rights <br />'• which may result from mining and reclamation <br />operations; and <br />f. development of an augmentation plan to mitigate <br />potential impacts to water rights, and a monitoring <br />plan to indicate changes in the surface-water flow <br />and water levels adjacent to the HUCLA EAST pit. <br />This report presents the results of GEOTRANS' study. <br />Peabody's owned, leased and optioned land and water <br />resources are presented in Chapter 2.0. The operational and <br /> <br />3 <br />GEOIRANS, INC. <br />