My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66125
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:03 PM
Creation date
11/20/2007 9:10:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
10/14/2003
Doc Name
Revised Permit Application form and bond calc
From
Greg Lewicki and Associates
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Eatimatina Software <br />PROJECT IDENTIFICATION <br />Task # : Ot3a <br />Date : 09/23/2003 <br />User : SSS <br />State :Colorado <br />County :Mesa <br />Site : Gilsonfte Pit <br />Pennitfjob# :M•2002-111 <br />Abbreviation :none <br />Filename :M111-06a <br />Agency or organization name :DMG <br />Permit or other job action :New 112c permit <br />Task description : Spread remaining topso// on Phase 3 <br />HOURLY EQUIPMENT COST <br />Basic machine :Cet 09R- 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : BOPS Cab <br />Attachment no. 2 ; 3-shank ripper <br />Cost Breakdown : Ownership cosf/hour <br />Operating cosUhour <br />Ripper op.cosVhour <br />Operator cost/hour <br />Total unit cosf/hour <br />MATERIAL QUANTITIES <br />Initial Swell <br />volume : 2,259 LCY factor <br />Utilization <br />Loose <br />NA volume : 2,259 LCY <br />$51.07 NA <br />$97.71 100 <br />$0.00 0 <br />$31.83 NA <br />$180.81 Total fleet cosUhour <br />Source of estimated volume :Topsoil remaining aRer S & E slopes of Phase 1 & 2 are covered <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors .Source <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCY/hr <br />Material consistency description <br />Average push gradient : 15.00 % (i <br />Average site attitude : 4,455 feet <br />Material weight: '1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />fleet size : 1 Dozers) <br />Unit cost : $0.217 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Ysibility : 1.00 <br />Job efficiency : .0.83 <br />Spoil pile : 0.70 <br />Push gradient: 1.33 <br />Altitude : 1.00 <br />Material weighf: 1.44 <br />Blade type : 1.00 <br />Net correction : 0.92 <br />Adjusted unit production : 833.49 LCY/hr <br />Adjusted fleet production : 833.49 LCYmr <br /> <br />Total job time : 2.71 Hours <br />Total job cost: $490 <br />Horsepower: 405 <br />Shin basis : 1 par day <br />Data source : (CRC) <br />$1so.s1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.