Laserfiche WebLink
CIRCES Cost Estimating Software <br />Agency or organization name :DMG <br />Permit or other job action :New 112b permit <br />Task description :Spread gravel over.25% of Staging Area <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3shank dpper , <br /> Data source : (CRG) <br /> Utilization °!o <br />Cost Breakdown : Ownership cosUhour : $51.07 NA <br />Operating cost/hour : $97.71 100 <br />Ripper op, cosVhour : $0.00 0 <br />Operator cost/hour : $31.83 NA <br />Total unit cosUhour : $180.61 Total fleet cost/hour : $180.61 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,815 LCY factor : NA volume : 1,815 LCY <br />Source of estimated volume :Assume 25% of <br />Source of estimated swell factor :NA <br />Area needs gravel for reclamation <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Loose stockoile <br />Average push gradient : 0.00 % (p~ <br />Average site altitude : 4,460 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Gravel - Drv <br />Operator skill : 0.75 <br />Matedal consistency : 1.20 <br />Dozing method : 1.00 <br />Visibility : 1.00 ~-~ <br />Job efficiency : 0.83 j <br />- <br />Spoil pile : 0.60 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weigfif : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.40 <br />Source <br />Adjusted unit production : 852.88 LCY/hr <br />4djusted fleet production : 852.88 LCYmr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 2.13 Hours <br />Unit cost : $0.212 /LCY Total job cost : $384 <br />Task#:. 07a State :Colorado Pennifrob#:M-2002-111. <br />Date : 09/232003 County :Mesa Abbreviation :none <br />User : SSS Site : Gilsonite Pit Filename :M111-07a <br />