My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE66125
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE66125
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:12:03 PM
Creation date
11/20/2007 9:10:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
10/14/2003
Doc Name
Revised Permit Application form and bond calc
From
Greg Lewicki and Associates
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estlmatlna Software <br />BULLDOZER WORK <br />Task#: 05a Sfate:Co/oredo Permitlob#:M-2002-111 <br />Date : 08/23/2003 County :Mesa Abbreviation :none <br />User : SSS Site : Gilsonite Pit Filename :M111-05a <br />Agency or organizafion name :OMG <br />Permit or other job action :New 112c permit <br />Task description :Lower elevation of beans between phases to 1' below water level <br />HOURLY EQ UIPMENT COST <br /> Basic machine : CatD9R - 9St1 Horsepower : 405 <br /> Blade type : Semi-Universe! <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br /> Attachmenino.2: 3shankripper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosUhour : $51.07 NA <br /> Operatingcost/hour: $97.71 100 - <br /> Ripper op, cost/hour : $2.40 25 <br /> Operator cosf/hour : $31.83 NA <br /> Total unit cosf/hour : 3183.01 Total fleet cosf/hour : .$183.01 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 15,480 BCY factor : 1.220 volume : 18,888 LCY <br />Source of estimated volume :1-2 berm (10k50k500), 1-3 bean (14k30'x400) <br />Source of estimated swell factor :CAT handbook <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient : 7.00 <br />Average site altitude : 4,455 <br />Material weight : 2,800 Ibs/LCY <br />Weight description <br />Clay- Natural bed <br />Source <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : f.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.16 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Adjusted unit production : 901.15 LCY/hr <br />Adjusted fleet production : 901.15 LCYIhr <br />Fleet size : 1 Dozers) <br />Unit cost : $0.203 /LCY <br />Total job time : 20.96 Hours <br />Total job cost : $3,835 <br />
The URL can be used to link to this page
Your browser does not support the video tag.