My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65856
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65856
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:51 PM
Creation date
11/20/2007 9:04:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977326
IBM Index Class Name
Permit File
Doc Name
CERT CDPS GENERAL PERMIT STORMWATER DISCHARGE ASSOCIATED WITH SAND & GRAVEL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PARTI <br />Page 5 <br />Permit No. COG-500000 <br />A. COVERAGE UNDER THIS PERMIT <br />the particular discharge. (Notification of denial shag be by letter, in cases where coverage under m alternate <br />general permit or an individual permit is required, imtrad of coverage under this general permit) <br />b. Automatic Coverage: If the applicant does not receive a request for additional information or a notification <br />of denial from the Division dated within thirty days of the receipt of the application by the Division, <br />authorization to discharge in accordance with the conditions of this permit shall be deemed granted. <br />o. Individual Permit Required: If, after evaluation of the application (or additional information, such as the <br />SWMP), it is found that this general permit is not applicable to the operation, rhea the application will be <br />processed as one for m individual permit. The apphant will be notified of the Division's decision to deny <br />certification under this general permit. For an individual permit, additional information may be requested, and <br />180 days will be required to process the application and issue the permit. Temporary coverage under this <br />gweral permit will be allowed until the individual permit goes into effect. <br />d. General vs. Individual Permit Corsage: Any owner or operator authorved by this permit may request to <br />be excluded from the coverage of this permit by applying for en individual CDPS permit. The owner or <br />operator shall submit m individual application to the Division, with reasons supporting the rogues[. <br />e. Permit CertiFirations: The individual certification prepared for each applicant will indicate whether Part I.B <br />of the permit which moat be followed by that applicant. PaR I.C must be followed by all permittees unless <br />exempted as outlined in Section III.C of the Ratiopale. (In the absence of such indication from the Division, <br />the permittee will be responsible for determining and then complying with the applicable sections in Part I J <br />in addition, all peimittees will be required to comply with Part I, subparts A, D, E and F, and all of <br />Part II of the permit. <br />6. Permit Expiration Date <br />Authorization to discharge under this general permit shall commence on October 1, 1992, end shall expire on <br />September 30, 1997. The Divisive must evaluate and reissue this general permit pace every five yeara, and must <br />also recertify the applicant's authority to discharge under the general permit at such time. Therefore, any permittee <br />desiring continued coverage order the general permit must reapply by March 31, 1997. The Division will determine <br />if the applicant may continue to operate under the terms of the general permit. <br />An individual permit will be required for any facility not reauthorized to discharge under the reissued general permit. <br />For facilities wishing to terminate authorization under the new permit, provisions of Part II.B.S.d will be applicable. <br />Inactivation of Certification <br />The permittee may request inactivative of thetr certification under this permit, once the site has been fully released <br />from their reclamation bved requiremwta by the Colorado Division of Mining end Geology (CDMG). See Pert <br />II.B.S.d of the permit. <br />B. EFFLUENT LIMITATIONS AND CONDITIONS -PROCESS WATER DISCHARGE <br />(Ibis section (I.B) only applies to facilities with a discharge of process water) <br />1. General Limitations <br />a. There shall be no discharge of sanitary waste waters from toilets or related facilities. <br />b. There shall be ao discharge of floating solids or visible foam in other then trace amomte. <br />
The URL can be used to link to this page
Your browser does not support the video tag.