Laserfiche WebLink
• PARTI <br />Page 12 <br />Permit No. COG-500000 <br />D. MONITORING AND REF'ORTINO <br />Renortin¢ of Data -Process Water TMG ambers <br />A sigrred copy of the report forms outlined in paregtaphs a and b, below, shall be submitted to each of the following <br />addressee: <br />Coloredo Department of Health <br />water Qualify Control Division <br />WQCD-PE-112 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 60222-1530 <br />Attn: Permits and Enforcement <br />U. S. Environmental Protxtion Agency <br />Water Management Divisimt <br />999 18th Street, Ste. 500 <br />Denver, Colotado 60202-2466 <br />Atln: NPDES Brmch, BWM~ <br />All reports required for submittal shall be sigrtod and certified for accuracy by the permittce. (See Part I.D.10 of the <br />permit.) <br />e. Quarterly Report - Process Water <br />For facilities allowed to discharge process water, reporting of the data gathered in wmplimce with Part I.B.3.a <br />shall be on a quarterly basis. <br />Monitoring results obtained during the previous 3 months shall be summarized and reported on Division <br />approved Discharge Monitoring Report forms (DMRs), postmarked no later then the 26th day of the month <br />following the completed calendar quarter. For example, for the 1st quarter (Jmuary, February, and March) the <br />quarterly report moat be received at this office postmarked no later then April 26. If no discharge occurs during <br />the reporting period, 'No Discharge' shall be reported. <br />b. Annual Report - Process Water <br />For facilities not allowed to discharge process water (see Part I.B.3.b of the permit), a report on whether or not <br />a discharge of process water has takes place at Ore facility is required, in letter form, on m amual basis. The <br />report shall rover October 1 through September 30 of each year, and will be due to the Division by the <br />following Otxober 28, beginning with the fast year or partial year of permit coverage. The Division reserves <br />the right the require additional information in the report, on a teen-by~ase basis, ae needed. <br />4. <br />Rerartin¢ of Data - Stormwatrr Discharners <br />a. Amual Report - SWMP <br />The permittee will be required to submit m amual report, covering Jmuary 1 through December 31 of each <br />year, w the overall compliance with the SWMP. The amual report will contain, at a ptinimum: <br />1) Name of permittee, address, phone number, and permit certification number. <br />2) A report on the facility's overall complimce with the SWMP. <br />3) A summary of each comprehensive stormwater facility inspection made, including date, findings, and <br />action taken. <br />4) Results and interpretation of my stormwater monitoring performed. <br />The amual report will be due W the Division on or before February 15 of each year, after the fast full year of <br />coverage under the permit. The exact due date for the permittee's fast amual report will be listed in their <br />permit certification. In no case will m amual report be due before February 15, 1994, unless specifically <br />