Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task#: 002 <br />Date : 05r10/2002 <br />User : RCO <br />State :Colorado Permit/job # : M-2002-014 <br />County : Conejos Abbreviation :none <br />Site :Robins Pit No. 1 Filename : M014-002 <br />Agency or organization name : DMG <br />Permit or other job action :New 110 application <br />Task description :Rip compaction in <br />HOURLY EQUIPMENT COST <br />area and access road <br />Basic machine : Cat D7R - 7SU <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank riooer <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $43.32 NA <br />Dozer operating cosUhour : $49.44 100 <br />Ripper operating cost hour : $6.08 100 <br />OperatorcosUhour : $27.99 NA <br />Total unit cost/hour : $126.83 Total fleet cosVhour <br />MATERIAL QUANTITIES <br />Alternate methods - <br />Seismic: NA <br />Area : 2.50 <br />NA <br />acres <br />Selected estimating method <br />Load factor : NA Bank volume <br />Rip depth (ft) : 1.50 Volume <br />Horsepower: 230 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Area <br />NA <br />6,050 <br />$126.83 <br />'. <br />BCY <br />BCY or CCY <br />Source of estimated quantity :permit application, map <br />Source of estimated load factor : NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Seismic : Seismic velocity : NA feeUsecond <br />Unadjusted production : NA cu. yds./hour <br />Area : Avg. ripping depth : 1.50 feeUpass <br />Average ripping width: 6.50 feeUpass <br />Average ripping length : 300.00 feeUpass <br />Average dozer speed : 88.00 feet/minute <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.734 acres/hour <br />Unadjusted production : 1,776.40 cu. yds./hour <br />JOB TIME AND COST <br />Fleet size : 1 dozers) <br />Unit cost : $0.098 per cu. yd. <br />Unadjusted production <br />per selected method : 1,776.40 cu. yds./hour <br />Site altitude : 8,300 feet <br />Altitude adjustment : 0.88 (Cat HB) <br />Job effciency factor : 0.83 (1 shift day) <br />Net job correction : 0.73 multiplier <br /> <br />Adjusted unit production : 1,297.48 cu. yds./hour <br />Adjusted fleet production : 1,297.48 cu. yds./hour <br />Total job time : 4.66 hours <br />Total job cost : $591 <br />