My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65842
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65842
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:51 PM
Creation date
11/20/2007 9:04:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002014
IBM Index Class Name
Permit File
Doc Date
5/10/2002
Doc Name
Cost Summary Form
From
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 001 State : Colorado Permitfjob# : M-2002-014 <br />Date : 05/10/2002 County : Conejos Abbreviation :none <br />User : RCO Site : Robins Pit No. 1 Filename : M014-001 <br />Agency or organization name : OMG <br />Permit or otherjob action :New 110 application <br />Task description :Rough grede site, eliminate piles, ensure drainage <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />MATERIAL QUANTITIES <br />Basic machine :Cat D7R - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Ownership cosUhour <br />Operating cosUhour <br />Ripper op. cosUhour <br />Operator cost hour <br />Total unit cosUhour <br />Initial Swell <br />volume: 1,210 LCY factor <br />Source of estimated volume : 3 ac x 3" dee <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance ; 50 feet <br />Unadjusted hourly production : 1,022.9 LCY/hr <br />Material consistency description <br />Conso/idated stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 75% Rock <br />0.00 % (, <br />8,300 feet <br />3,300 Ibs/LCY <br />Utilization °~ <br />$43.32 NA <br />$49.44 100 <br />$0.00 0 <br />$27.99 NA <br />$120.75 To <br />Loose <br />NA volume <br />Horsepower: 230 <br />Shift basis : 1 perday <br />Data source : (CRG) <br /> <br /> <br /> <br /> <br /> tal fleet cost/hour <br />Job Condition Correction Factors <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency :_ <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Bladetype:_ <br />Net correction <br />Earth <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 <br />1.00 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />1.00 <br />0.88 <br />0.70 <br />1.00 <br />0.27 <br />$120.75 <br />273.28 LCY/hr <br />273.28 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 4.43 Hours <br />Unit cost : $0.442 /LCY Total job cost : $535 <br />
The URL can be used to link to this page
Your browser does not support the video tag.