My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE65842
DRMS
>
Back File Migration
>
Permit File
>
700000
>
PERMFILE65842
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 11:11:51 PM
Creation date
11/20/2007 9:04:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002014
IBM Index Class Name
Permit File
Doc Date
5/10/2002
Doc Name
Cost Summary Form
From
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />'KVJCl41 IUCIVIIr'IGHIIVN / <br />Date : 10-May-2002 Permit or job no. <br />User: RCO f Abbreviation <br />Filename <br />Agency or organization name : DMG <br />Permit or iob action :New 110 application <br />NO. TASK DESCRIPTION <br />001 -Rough grade site, eliminate piles, ensure drainac <br />002 -Rip compaction in staging area and access road <br />003 -Rep/ace topsoil on disturbed area <br />004 -Revegetate disturbed area <br />005 -Haul rec/amation equipment to and from site <br />includes inflation factor adjustment of: <br />INDIRECT COSTS <br />OVERHEAD AND PROFVT - <br />M-2002-014 <br />none <br />M014-000 <br />NA <br />Liability +nsurance <br />Performance bond <br />Job superintendent <br />Profit <br />"not requlrad (or eqp. operarorserves as super) <br />1.55 <br />1.05 <br />NA" <br />10.00 <br />°~~ <br />~: °: J ? ~ 70p~ <br />Site :Robins Pd No: 1 <br />State : Co/orado <br />County : Conejos <br />FORM IFLEETI TASK I DIRECT <br />USED SIZE HOURS COST <br />ripper 1 4.66 $591 <br />dozer 1 9.11 $1,100 <br />evege 1 8.0 $2,921 <br />robilize 1 4.2 $1,500 <br />SUBTOTALS: 30.40 $6,647 <br />TOTAL DIRECT COST= $6,847 <br />_ % of direct total = $103 <br />of direct total = $70 <br />NA NA total = NA <br />of direct total = $665 <br /> TOTAL O & P = $838 <br />CONTRACT AMOUNT (direct+O&P)= $7,485 <br />PROJECT MANAGEMENT - <br />Engineering work and/or contract bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $374 <br />CONTWGENCY- NA" NA total = NA <br />•cronungencres accounted !Drat task level TOTAL INDIRECT COST= $1,212 <br />TOTAL BOND AMOUNT (direct + indirect) _ $7,859 // <br />
The URL can be used to link to this page
Your browser does not support the video tag.