Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 05/10/2002 <br />User <br />RCO <br />Agency or organization name : DMG <br />Permit or otherjob action :New 110 application <br />Task description :Replace topsoil on disturbed area <br />HOURLY EQUIPMENT COST <br />State :Colorado Permitlob# : M-2002-014 <br />County : Conejos Abbreviation :none <br />Site :Robins Pit No. 1 Filename : M014-003 <br />Basic machine : Caf D7R - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $43.32 NA <br />OperatingcosUhour : $49.44 100 <br />Ripper op. cosUhour : $0.00 0 <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $120.75 Total fleet cosUhour : $120.75 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 2,151 LCY factor : NA volume: 2,151 LCY <br />Source of estimated volume : 4 ac x 4" <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjusted hourly production : 714.3 LCY/hr <br />Material consistency description <br />Consolidated sfockoile <br />Average push gradient: 5.00 % (, <br />Average site altitude : 8,300 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Drv packed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.511 /LCY <br />Horsepower: 230 <br />Source <br />Operator skill : 0.75 (av <br />Material consistency : 1.00 (Cat <br />Dozing method : 1.00 (ge <br />Visibility : 1.00 (a~ <br />Job efficiency: 0.83 (lshif <br />Spoil pile : 0.60 (fnc <br />Push gradient : 1.11 (Cat <br />Altitude : 0.88 (Cat <br />Material weight : 0.90 (Cat <br />Blade type : 1.00 (S/S <br />Net correction : 0.33 <br />Adjusted unit production : 236.11 LCY/hr <br />Adjusted fleet production : 236.11 LCY/hr <br /> <br />Total job time : 9.11 Hours <br />Total job cost : $1,100 <br />